HomeMy WebLinkAboutSUB200800138 Review Comments Bond Estimate 2011-08-19Westhall Phase V Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed / compete cost remaining Summerdean Road 10 +00.00 to 18 +7; road length 873.1 ft 1 aggregate base* 6.0 in d 873.1 ft L 25.2 ft W 408.0 cy $35.91 $14,652.22 0% $14,652.22 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 3.0 in d 873.1 ft L 25.2 ft W 308.5 tons $73.50 $22,672.38 0% $22,672.38 4 asphalt surface 2.0 in d 873.1 ft L 25.2 ft W 205.6 tons $81.90 $16,842.34 0% $16,842.34 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 1645.0 ft $13.83 $22,747.88 0% $22,747.88 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4' width 1605.0 ft $11.66 $18,706.28 0% $18,706.28 10 ramp CG -12 6 $315.00 $1,890.00 0% $1,890.00 11 street name sign 2 $65.00 $130.00 0% $130.00 12 traffic control sign 6 $49.35 $296.10 0% $296.10 13 Street Landscape 13 Each 13 $105.00 $1,365.00 0% $1,365.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 15 $1,365.00 $20,475.00 0% $20,475.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 17 pipe, rcp (15 to 48 ") 48.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $126.00 $0.00 0% $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19A pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 532.5 ft $23.10 $12,301.67 0% $12,301.67 19B pipe, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 194.2 ft $27.30 $5,302.75 0% $5,302.75 19C pipe, cmp (15 to 48 ") 21.0 in d 1 ES -1,2 $250 1 EC -1 $200 219.6 ft $33.60 $7,827.89 0% $7,827.89 19D pipe, cmp (15 to 48 ") 24.0 in d 1 ES -1,2 $250 1 EC -1 $200 475.7 ft $39.90 $19,431.23 0% $19,431.23 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 0 ft L 4 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (per cy for cut or import only 0.0 cy fill 0.0 cy cut 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per road) 873.1 ft L 1.74612 inc of 500' 3 $157.50 $441.00 0% $441.00 25 as-built drawings (1 k + price per 0.1 873.1 ft L 0.16535 mi. 2 $1,050.00 $3,100.00 0% $3,100.00 26 survey and layout (price per 0.1 mi.) 873.1 ft L 0.16535 mi. 2 $525.00 $2,050.00 0% $2,050.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 873.1 ft L 0.16535 mi. 2 Lanes $2,000.00 $6,614.09 0% $6,614.09 29 VDOT maintenance fee (1 In rd, 1 yr) 873.1 ft L 0.16535 mi. 2 Lanes $150.00 $496.06 0% $496.06 30 VDOT admin. Cost recovery fee(1 lar 873.1 ft L 0.16535 mi. 2 Lanes $100.00 $580.70 0% $580.70 subtotal $178,447.60 $178,447.60 Jonna Street 10 +10.00 to 12 +9( road length 280.0 ft 1 aggregate base 8.0 in d 280.0 ft L 26.0 ft W 179.8 cy $35.91 $6,454.93 0% $6,454.93 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 3.0 in d 280.0 ft L 26.0 ft W 101.9 tons $73.50 $7,491.12 0% $7,491.12 4 asphalt surface 2.0 in d 280.0 ft L 26.0 ft W 67.9 tons $81.90 $5,564.83 0% $5,564.83 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 520.0 ft $13.83 $7,190.82 0% $7,190.82 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4' width 520.0 ft $11.66 $6,060.60 0% $6,060.60 10 ramp CG -12 0 $315.00 $0.00 0% $0.00 11 street name sign 0 $65.00 $0.00 0% $0.00 12 traffic control sign 5 $49.35 $246.75 0% $246.75 13 Street Landscape 10 Each 10 $105.00 $1,050.00 0% $1,050.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 3 $1,365.00 $4,095.00 0% $4,095.00 16 pipe, rcp (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.30 $0.00 0% $0.00 17 pipe, rcp (15 to 48 ") 48.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $126.00 $0.00 0% $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 101.3 ft $23.10 $2,340.72 0% $2,340.72 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 420 ft L 4 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (per cy for cut or import only 0.0 cy fill 0.0 cy cut 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per road) 280.0 ft L 0.56 inc of 500' 2 $157.50 $252.00 0% $252.00 25 as -built drawings (1 k +price per 0.1 280.0 ft 0.05303 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 280.0 ft L 0.05303 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 280.0 ft L 0.05303 mi. 2 Lanes $2,000.00 $2,121.21 0% $2,121.21 29 VDOT maintenance fee (1 In rd, 1 yr) 280.0 ft L 0.05303 mi. 2 Lanes $150.00 $159.09 0% $159.09 30 VDOT admin. Cost recovery fee(1 Iar 280.0 ft L 0.05303 mi. 2 Lanes $100.00 $356.06 0% $356.06 subtotal $47,483.14 $47,483.14 8/19/2011 Westhall Phase V Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed / compete cost remaining Westhall Drive 10 +00.00 to 11 +8( road length 180.6 ft 1 aggregate base 6.0 in d 180.6 ft L 26.0 ft W 87.0 cy $35.91 $3,122.92 0% $3,122.92 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 3.0 in d 180.6 ft L 26.0 ft W 65.7 tons $73.50 $4,832.31 0% $4,832.31 4 asphalt surface 2.0 in d 180.6 ft L 26.0 ft W 43.8 tons $81.90 $3,589.71 0% $3,589.71 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 360.0 ft $13.83 $4,978.26 0% $4,978.26 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4' width 110.0 ft $11.66 $1,282.05 0% $1,282.05 10 ramp CG -12 2 $315.00 $630.00 0% $630.00 11 street name sign 0 $65.00 $0.00 0% $0.00 12 traffic control sign 3 $49.35 $148.05 0% $148.05 13 Street Landscape 6 Each 6 $105.00 $630.00 0% $630.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 0 $1,365.00 $0.00 0% $0.00 16 pipe, rcp (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.30 $0.00 0% $0.00 17 pipe, rcp (15 to 48 ") 48.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $126.00 $0.00 0% $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 270.93 ft L 4 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (per cy for cut or import only 0.0 cy fill 0.0 cy cut 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per road) 180.6 ft L 0.36124 inc of 500' 1 $157.50 $220.50 0% $220.50 25 as -built drawings (1 k +price per 0.1 180.6 ft 0.03421 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 180.6 ft L 0.03421 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 180.6 ft L 0.03421 mi. 2 Lanes $2,000.00 $1,368.33 0% $1,368.33 29 VDOT maintenance fee (1 In rd, 1 yr) 180.6 ft L 0.03421 mi. 2 Lanes $150.00 $102.63 0% $102.63 30 VDOT admin. Cost recovery fee(1 lar 180.6 ft L 0.03421 mi. 2 Lanes $100.00 $318.42 0% $318.42 subtotal $25,323.18 $25,323.18 Brookwood Road 16 +57.96 to 17 +9, road length 136.4 ft 1 aggregate base 6.0 in d 136.4 ft L 26.0 ft W 65.7 cy $35.91 $2,358.18 0% $2,358.18 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 3.0 in d 136.4 ft L 26.0 ft W 49.6 tons $73.50 $3,648.98 0% $3,648.98 4 asphalt surface 2.0 in d 136.4 ft L 26.0 ft W 33.1 tons $81.90 $2,710.67 0% $2,710.67 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 240.0 ft $13.83 $3,318.84 0% $3,318.84 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4' width 230.0 ft $11.66 $2,680.65 0% $2,680.65 10 ramp CG -12 0 $315.00 $0.00 0% $0.00 11 street name sign 1 $65.00 $65.00 0% $65.00 12 traffic control sign 3 $49.35 $148.05 0% $148.05 13 Street Landscape 3 Each 3 $105.00 $315.00 0% $315.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 4 $1,365.00 $5,460.00 0% $5,460.00 16 pipe, rcp (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.30 $0.00 0% $0.00 17 pipe, rcp (15 to 48 ") 48.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $126.00 $0.00 0% $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 156.7 ft $23.10 $3,619.08 0% $3,619.08 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 204.59 ft L 4 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (per cy for cut or import only 0.0 cy fill 0.0 cy cut 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per road) 136.4 ft L 0.27278 inc of 500' 1 $157.50 $204.75 0% $204.75 25 as -built drawings (1 k+ price per 0.1 136.4 ft L 0.02583 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 136.4 ft L 0.02583 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 136.4 ft L 0.02583 mi. 2 Lanes $2,000.00 $1,033.26 0% $1,033.26 29 VDOT maintenance fee (1 In rd, 1 yr) 136.4 ft L 0.02583 mi. 2 Lanes $150.00 $77.49 0% $77.49 30 VDOT admin. Cost recovery fee(1 Iar 136.4 ft L 0.02583 mi. 2 Lanes $100.00 $301.66 0% $301.66 subtotal $30,041.61 $30,041.61 Rella Court START to END 1 aggregate base 8.0 in d 4842.0 sgft 119.6 cy $35.91 $4,293.24 0% $4,293.24 2 blotted or prime &double seal 0.0 sgft 0.0 sy $6.30 $0.00 0% $0.00 8/19/2011 Westhall Phase V Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed / compete cost remaining 3 asphalt base 0.0 in d 0.0 sgft 0.0 tons $73.50 $0.00 0% $0.00 4 asphalt surface 2.0 in d 4842.0 sgft 45.2 tons $81.90 $3,701.22 0% $3,701.22 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 520.0 ft $13.83 $7,190.82 0% $7,190.82 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 It W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4' width 220.0 ft $11.66 $2,564.10 0% $2,564.10 10 ramp CG -12 1 $315.00 $315.00 0% $315.00 11 street name sign 1 $65.00 $65.00 0% $65.00 12 traffic control sign 0 $49.35 $0.00 0% $0.00 13 Street Landscape 0 Each 0 $105.00 $0.00 0% $0.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 2 $1,365.00 $2,730.00 0% $2,730.00 16 pipe, rcp (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 92.7 ft $27.30 $2,531.26 0% $2,531.26 17 pipe, rcp (15 to 48 ") 48.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $126.00 $0.00 0% $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 0 ft L 4 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (per cy for cut or import only 0.0 cy fill 0.0 cy cut 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per road) 0.0 ft L 0 inc of 500' 1 $157.50 $157.50 0% $157.50 25 as -built drawings (1 k +price per 0.1 0.0 ft L 0mi. 0 $1,050.00 $1,000.00 0% $1,000.00 26 survey and layout (price per 0.1 mi.) 0.0 ft L 0 mi. 0 $525.00 $1,000.00 0% $1,000.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 0.0 ft L 0 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 29 VDOT maintenance fee (1 In rd, 1 yr) 0.0 ft L 0 mi. 0 Lanes $150.00 $0.00 0% $0.00 30 VDOT admin. Cost recovery fee(1 lar 0.0 ft L 0 mi. 0 Lanes $100.00 $250.00 0% $250.00 subtotal $26,323.14 $26,323.14 Trailhead Park /Park Road 1 aggregate base 4.0 in d 245.0 ft L 6.0 ft W 18.1 cy $35.91 $651.70 0% $651.70 2 asphalt surface 2.0 in d 245.0 ft L 6.0 ft W 13.7 tons $81.90 $1,123.67 0% $1,123.67 3 aggregate base 4.0 in d 220.0 ft L 10.0 ft W 27.2 cy $35.91 $975.33 0% $975.33 4 asphalt surface 2.0 in d 220.0 ft L 10.0 ft W 20.5 tons $81.90 $1,681.68 0% $1,681.68 5 fence gate 1 Each 1 $100.00 $100.00 0% $100.00 6 chain link fence 185.0 ft $8.40 $1,554.00 0% $1,554.00 7 Deciduous Tree (1 -1/2 cal.) 37 Each 37 $250.00 $9,250.00 0% $9,250.00 8 Deciduous Tree (0 -8ft) 43 Each 43 $150.00 $6,450.00 0% $6,450.00 9 Conifer Tree (0 -8ft) 35 Each 35 $100.00 $3,500.00 0% $3,500.00 10 White Pine 5Each 5 $300.00 $1,500.00 0% $1,500.00 11 Large Shrub (> 1.5ft tall) 14 Each 14 $50.00 $700.00 0% $700.00 12 Small Shrub ( <1.5ft) 14 Each 14 $25.00 $350.00 0% $350.00 13 Bollard 1 Each 1 $150.00 $150.00 0% $150.00 14 Furniture (bench, picnic table, etc.) 6 Each 6 $200.00 $1,200.00 0% $1,200.00 15 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 3 EC -1 $200 129.0 ft $23.10 $3,579.90 0% $3,579.90 16 Tot Lot 2100 sf 2100 $6.00 $12,600.00 0% $12,600.00 subtotal $45,366.28 $45,366.28 Grading 1 grading (per cy for cut or import only 15285 cy fill 26669 cy cut - 11384.0 cy bal $3.15 $84,007.35 0% $84,007.35 subtotal $84,007.35 $84,007.35 cost sum $436,992.30 $436,992.30 proj mgmt $65,548.85 $65,548.85 contingency $50,254.11 $50,254.11 Total $552,800 $552,800 8/19/2011