Loading...
HomeMy WebLinkAboutWPO201100042 Review Comments Bond Estimate 2011-08-19 (3)BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Crown BMW Retail Parts & Service Building PROJECT NUMBER: WPO- 2011 -00042 DATE OF ESTIMATE: 08/19/11 ESTIMATE BY: PBC BASED ON: plans signed 6 -29 -11 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.8 1500 4200 SILT FENCE LF 180 5 900 SAFETY FENCE LF 600 3 1800 TREE PROTECTION FENCE LF 360 3 1080 DIVERSION DIKE LF 420 3 1260 SEDIMENT BASIN 1 ACRES 2.5 1000 2500 INLET PROTECTION EA 16 200 3200 PAVED CONSTRUCTION ENTRANCE EA 3 2000 6000 subtotal 20940.00 project management 3141.00 subtotal 24081.00 CONTINGENCY LS 10% 2408.10 TOTAL 26489.10 BOND AMOUNT REQUIRED 26500.00