Loading...
HomeMy WebLinkAboutWPO201100042 Review Comments Bond Estimate 2011-08-19PROJECT NAME: Crown BMW Retail Parts & Service Building FILE #: WPO- 2011 -00042 DATE APPROVED: Pending Item Unit Amount Unit Cost Subtotal Filterra 4x6 each 3 $8,100.00 $24,300 Filterra 4x12 each 1 $12,900.00 $12,900 Filterra 6x8 each 1 $11,700.00 $11,700 Filterra Installation per project 5 $12,225 Stormfilter 1 (2 cartridges) each 1.00 $9,020.00 $9,020.00 from engineer Stormfilter 2 (3 cartridges) each 1.00 $11,550.00 $11,550.00 from engineer Stormfilter 3 (3 cartridges) each 1.00 $11,550.00 $11,550.00 from engineer Stormfilter Installation per project 3 $8,030 CM underground detention each 1.00 $68,000.00 $68,000 from engineer detention installation each 1.00 $34,000.00 $34,000 (50% of cost of facility) subtotal $203,M project management $30,491 subtotal $233,766 10% Contingency $23,377 TOTAL $257,143 ROUNDED TOTAL $257,200 min total after reduction $515440