Loading...
HomeMy WebLinkAboutWPO201100069 Review Comments Erosion Control Plan 2011-10-14ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO- 2011 - 00069, Route 29 Water Main Abandonment at HTC Plan preparer: Michael Baker, Jr., Inc. Owner or rep.: Mr. Doug March, PE; Rivanna Water and Sewer Authority Date received: 29 August 2011 Date of Comment: 14 October 2011 Engineer: Phil Custer The ESC plan for the Route 29 12 -In Water Main Abandonment at Hollymead Town Center, received on 29 August 2011, has been reviewed. The plan can be approved after the following comments have been addressed: 1. All work within the public ROW will require a permit from VDOT. Has VDOT reviewed the current proposal yet? 2. Please forward all proof of all easements, temporary and permanent, from the property owners of these parcels once they are finalized. 3. Please clearly indicate the limits of construction on sheet 3. It seems the rest of the work is the removal of valves and other appurtenances within the pavement, which does not need an ESC plan. If another area requires work within dirt/grass, please indicate on the plan and provide ESC measures as necessary. 4. Please provide a culvert and gravel area for the crossing of the ditch in the median. Please provide silt fence just above the top of this ditch to prevent sediment loss for the work needed to create the receiving pit. Please indicate on the plan where the spoils of such pit will be placed. Please make sure this stockpile is adequately protected. 5. The entrance pit seems to be located in the existing ditch. If the entrance pit must be placed at its current location, I recommend extending a temporary slope drain from the outlet of the VDOT drainage system across the work area to prevent concentrated discharge from creating issues on site. To prevent sheet flow from the roadway, a gravel ROW diversion on the eastern side of the ditch would prevent water from entering the work area. 6. A check dam is not an adequate ESC protection measure. Please provide silt fencing or a sediment trap for the disturbance on the entrance pit side of the road. Please make sure the location of the soil stockpile (from the entrance pit) is specified and that this area is also protected. 7. An Erosion and Sediment Control Narrative is required. Please see page VI -13 of the Virginia Erosion and Sediment Control Handbook for a checklist for an ESC narrative. 8. Inlet protection on the VDOT curb inlet does not appear to be necessary because the disturbance is all downstream of its watershed. 9. Please provide Permanent Seeding (PS) and Dust Control (DC) symbols throughout the disturbed area. 10. The county has updated its standard ESC Note set. Please use the latest version found in the county's design manual. 11. To receive a bond estimate, please provide a completed Bond Estimate Request Form to the County Engineer after all comments have been addressed. File: El esc PBC WPO- 2011 -00069 Route 29 Water Main Abandonment.doc