Loading...
HomeMy WebLinkAboutWPO201100071 Review Comments Erosion Control Plan 2011-10-15ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO- 2011 - 00071, RE- Store'n Station ESC Plan Plan preparer: Mr. Nat Perkins, PE; NP Engineering Owner: Jefferies IL LLC Owner's Rep.: Mrs. Jo Higgins; Project Development Limited Date received: 31 August 2011 Date of Comment: 15 October 2011 Engineer: Phil Custer The ESC plan for the RE- Store'n Station (WPO- 2011 - 00071), received on 31 August 2011, has been reviewed. The plan can be approved after the following comments have been addressed: 1. It appears that the ESC Plans were all printed at 30scale, not 40. If this is correct, please replace all references to 40 scale with 30 scale. 2. On all three phases, please clearly show and label the limits of disturbance boundary. 3. Please show all proposed grading on Phase 2 and Phase 3. It is difficult to evaluate the adequacy of these phases without proposed contours. Additional comments may be necessary because the plan was not able to be fully evaluated. 4. Related to the previous comment, the sediment basin and sediment trap should be sized for the largest watershed each facility will likely experience as the site is filled in. For instance, the site will likely be tipped towards the sediment basin, since the stormwater facility is located in the vicinity, so its drainage area will increase as the earthwork progresses. 5. Silt fence is frequently proposed perpendicular to contour lines in this plan which is not allowed per state guidelines. In these instances, water will not travel through the fence but will be redirected downhill, like a diversion. Please replace the silt fence on the east side of the property line with a diversion from the northeast corner to the sediment trap. On the west end of the property, please simply remove the silt fence. If a visual boundary is desired by the applicant, I recommend a type of safety fence. 6. Please remove the silt fence from directly below the outlet of both settling facilities. Silt fence cannot receive concentrated flow. 7. During the review of the preliminary site plan, the Chief of Current Development, Bill Fritz, approved the disturbance of a 20ft wide section of the undisturbed buffer to the south. Please show the area of the buffer that was approved for disturbance. It appears that the area shown on this submittal does match the area approved by Bill. If the area proposed for disturbance is, in fact, different, another waiver of this disturbance may need to be processed. 8. The embankment of the sediment basin ties into existing grade within the undisturbed buffer (see where the 676 contour line would be). Please modify the plan to make sure no disturbance to the undisturbed buffer occurs, other than the area previously authorized. 9. In plan view, please draw the sediment basin bottom as 671. 10. Please show Permanent Seeding (PS) symbols throughout the plan where necessary. 11. Please include the county's paved wash rack detail in this sheet set. This detail can be found in the county's design manual on page 28 of 35. 12. The county has updated its standard ESC Note set. Please use the latest version found in the county's design manual. 13. An analysis of the downstream channel per Minimum Standard 19 was not provided with the ESC plan. Please refer to page 7 (of 35) of the County's Design Manual and the Virginia Erosion and Sediment Control Handbook for what the county expects for an analysis of downstream channels. Per state law, this analysis must be performed using the 24 -hour storm. 14. Please provide the cross - sections and calculations (2 -year velocity and 10 -year capacity) for the new VDOT ditch. Please specify any liner, if necessary. 15. To receive a bond estimate, please provide a completed Bond Estimate Request Form to the County Engineer after all comments have been addressed. All owners of properties disturbed with this application must sign this document and be party to the bond unless all offsite easements are recorded. The easements must be written in a manner that allows the county and its assigns to the construction site. Pitc: El csc PBC WPO- 2011 -00071 RE- Storc'n Station ESC Plan.doc