Loading...
HomeMy WebLinkAboutWPO200900067 Review Comments Road Plan and Comps. 2011-09-02Philip Custer From: Philip Custer Sent: Friday, September 02, 2011 4:33 PM To: 'djensen @wwassociates.net'; 'Richard T. Spurzem' Subject: FW: WPO- 2010 -00067 North Pointe North Entrance Rte. 29 Improvements I'm writing this email to inform you that: "all work within the Route 29 right of way will require a Land Use Permit from VDOT. Because the plan includes improvements that are considered critical infrastructure, we will be requiring a VDOT inspector to oversee certain phases of the construction of this project. An accounts receivable will be set up with the permitting of the work and the applicant will be responsible for covering the costs of the inspection on a monthly basis. During the permitting, we will list all mandatory inspections by VDOT and request the applicant give adequate notice of these phases of construction that require inspection." Please provide the county with 6 copies of the set approved by VDOT. Please note that a bond must be posted for this work before SDP - 2010 -00021 is signed. To request a bond, please submit a Bond Estimate Request Form to the County Engineer with a $250 fee. Please let me know if you have any questions. Thanks, Phil From: DeNunzio, Joel D., P.E. [ mailto:J oel.DeNunzio @VDOT.virginia.gov] Sent: Friday, September 02, 20113:05 PM To: Philip Custer Cc: Seale, Dennis L.; Winn, Jr., John W. L.S.; djensen @wwassociates.net Subject: WPO- 2010 -00067 North Pointe North Entrance Rte. 29 Improvements Phil, VDOT has completed our review of the subject project and all VDOT comments have been adequately addressed with the revisions submitted to me electronically for sheets 5, 7, 8, 9, 12, 13 and 18 with a revised date of 8 -8 -2011 and sheet 9A with a revised date of 9 -2 -2011. The remainder of the sheets are dated 6 -17 -2011. The applicant has been working with VDOT directly since the last submission to the county on 6 -17 -2011 and will be submitting the revisions to the county listed above. Please inform the applicant that all work within the Route 29 right of way will require a Land Use Permit from VDOT. Because the plan includes improvements that are considered critical infrastructure, we will be requiring a VDOT inspector to oversee certain phases of the construction of this project. An accounts receivable will be set up with the permitting of the work and the applicant will be responsible for covering the costs of the inspection on a monthly basis. During the permitting, we will list all mandatory inspections by VDOT and request the applicant give adequate notice of these phases of construction that require inspection. Please let me know if you have any questions or comments. Thanks Joel Joel DeNunzio, P.E. VDOT Culpeper Land Development 434 - 589 -5871 joel.denunzio @vdot.virginia.gov From: David Jensen [mailto:djensen @wwassociates.net] Sent: Friday, September 02, 2011 1:48 PM To: DeNunzio, Joel D., P.E. Cc: 'Herb WHITE' Subject: RE: North Pointe North Entrance Rte. 29 Improvements Joel, Attached above is Drawing Number C- 9A with requested change added to the profile at structure #4. Please forward your approval to Phil Custer at the County. Thanks, David M. Jensen, PE Vice - President E�c[r+�FFk.R SuKvFroks PLANK ER& o i ATE Office Phone: 434.960.7549 Main: 434.984.2700 Fax: 434.978.1444 3040 Avemore Square Place Charlottesville, VA 22911 djensen @wwassociates.net www.wwassociates.net From: DeNunzio, Joel D., P.E. [ mailto:J oel.DeNunzio @VDOT.virginia.gov] Sent: Friday, September 02, 2011 11:00 AM To: djensen @wwassociates.net Subject: RE: North Pointe North Entrance Rte. 29 Improvements David, I have reviewed the changes and they look good. The only thing I have additional is that you need to call out a safety slab, standard SL -1 for structure #4 on sheet C -9A. Other than that I think this plan is approvable. Please make the change on sheet C -9A and send a pdf, or if you need to submit through the county, you can make the change and sent them the plan. Thanks Joel Joel DeNunzio, P.E. VDOT Culpeper Land Development 434 - 589 -5871 joel.denunzio @vdot.virginia.gov From: David Jensen [mailto:djensen @wwassociates.net] Sent: Wednesday, May 25, 2011 5:31 PM To: DeNunzio, Joel D., P.E. Subject: North Pointe North Entrance Rte. 29 Improvements Joel, Attached is an exhibit with the median along the Rte. 29 South Bound lane new left turn lane graded out in strict accordance with GS -13 standard. It is extremely flat. I would need to install inlets probably every 50' and grade out intermediate high points and low points to collect drainage. Please note that on each side of the median a 4' unpaved shoulder at 5/8" : 1' is provided adjacent to the new or existing paved shoulder prior to grading out at 6'H:1'V to the low point. Do you have any other alternatives that would be acceptable to VDOT? David M. Jensen, PE Vice - President = Fsc,LNEEM PLANK ER& s on ATE Office Phone: 434.960.7549 Main: 434.984.2700 Fax: 434.978.1444 3040 Avemore Square Place Charlottesville, VA 22911 diensen @wwassociates.net www.wwassociates.net