Loading...
HomeMy WebLinkAboutWPO201100055 Review Comments Erosion Control Plan 2011-09-23ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: The Shops at Stonefield -Regal Cinema Final Site, ESC, and SWM Plans; SDP - 2011 -00047 and WPO- 2011 -00055 Plan preparer: Mr. Herb White, PE; W & W Associates Owner or rep.: Albemarle Place EAAP LLC Date received: (Rev. 1) 31 August 2011 22 June 2011 Date of Comment: (Rev. 1) 23 September 2011 3 August 2011 Engineer: Phil Custer The final site, ESC, and SWM plans for The Shops at Stonefield -Regal Cinema (SDP- 2011 -00047 and WPO- 2011 - 00055) received on 31 August 2011, have been reviewed. The plans can be approved after the following comments have been addressed: A. Final Site Plan, Private Road Plan, and Drainage Plan Review (SDP- 2011 - 00047) 1. Engineering revic�, — , oncerned wi— — ane parking spaces close to the entrances that have limited sight lines because of the building walls. Some of the spaces near the entrances may need to be eliminated. Please provide an analysis of parking spaces around the entrances in relation to the sight lines. (18- 7.2.7) (Rev. 1) Comment has been withdrawn. The applicant has stated that there are no walls at the entrances to the garage so sight distance is not limited. 2. Please provide typical details for the walls used on site. The details should show a handrail at the top of the wall. (Rev. 1) Comment has been addressed. 3. For all walls taller than 4ft on Sheet C -7, please callout a handrail. (Rev. 1) Comment has been addressed. 4. Please provide the deedbook and page number for the ACSA easement on the Sperry property for the new line to EX MH S -17. Please note that this site plan cannot be approved until this easement is recorded. (Rev. 1) Typically, offsite service authority easements require recordation of a plat before site plan approval can take place. I have forwarded the documents provided tome to others within the Community Development Department to get their opinion on whether the signed agreements between Albemarle Place and Northrup Grumman are adequate for the county to issue site plan approval. Have any of the documents provided tome been recorded at the county courthouse? Please add a ditch north of Main Street (on the hotel block) from Inglewood to a new drop inlet that goes into Inlet 43.6. (Rev. 1) Comment has not been addressed. Since Inlet 43.6 is sized for the watershed, a continuous concrete or asphalt curb can be shown on the plan to address this comment. If the plans are built concurrently, this curb will not need to be constructed. If there is a delay between hotel construction and the construction of this road, we will have an acceptable plan. 6. For storm drain and road profiles, please also show the existing grade line of the site before the mass grading plan was executed. (Rev. 1) County Engineering has provided relief on this requirement to allow a cut fill exhibit to address this comment. B. Erosion and Sediment Control Plan Review (WPO- 2011 - 00055) 1. Che se to the :s ESC JM sheets, but no WPO application was submitted. A review of both plans was performed anyway. Please provide a WPO application and $600 fee as soon as possible so that this comment letter can be tied to this application. (Rev. 1) Comment has been addressed. 2. Because of strict requirements of Water Protection Ordinance Section 17- 207.B.2, erosion and sediment control plans for projects of such a large size must be designed to be closed out as soon as possible. For this reason, subsequent plans cannot assume that the sediment basins constructed with the mass grading application will remain online. Therefore, each ESC plan must be a standalone application. This ESC plan assumes that the mass grading plan has been completed and is stabilized, but still relies on the sediment basin for ultimate sediment treatment. This ESC plan must be a standalone plan. (Rev. 1) Except for the modification mentioned in comment B3 below, the current plan is acceptable. However, it's critical to make clear that this plan is not a standalone plan, but relies on a sediment basin and temporary pipe system that was approved and constructed under WPO- 2009 - 00074, Albemarle Place Mass Grading. Without this plan, the plan currently under review (WPO- 2011 - 00055) would not meet state standards. The nine month disturbance limit for this mass grading plan will be reached on 112612011. Before that date, an extension must be approved by the Board of Supervisors since the reason for the extension is a construction sequencing decision made by the applicant, and not something out of the applicant's control such as poor weather. To receive this extension, the applicant must provide a request for extension by 1112312011 to the clerk of the Board of Supervisors. If the Board of Supervisors does not allow a portion of the mass grading plan that is relied upon by a subsequent plan to remain active, that plan approval would be invalidated and a stop work order for all related construction will be issued until an amendment is approved that meets state regulations without the basin. Sediment -laden water must not enter the stormsewer system and detention facilities. Inlet protection is more often than not an inadequate measure because the inlets are constructed well after initial land disturbance. Even after installation, storm inlets are often bypassed because their rim elevation is higher than the subbase and gravel around them until the final stage of construction. Until both portions of the site are nearly complete, much of the water will be draining to the northeast. It looks as though diversions on the north and east at the limits of construction for both areas (cinema and the parking lot) can be installed to direct runoff to sediment basins retrofitted onto structures 43.6 and 48 or 49. (Rev. 1) There is an issue with the construction sequence in the parking lot west of Stonefteld Blvd. An extension of the temporary system to the south (to approximately Inlet 61 or 62) will be necessary. As the parking lot is graded and the inlets installed, water will bypass these facilities and run into the street unless there was an extension of the temporary system to this area to accept this water in a sump condition with the other inlets in the area sealed. Also, this parking lot drainage system goes to the permanent storm water facility without a settling facility which is not allowable per the meeting between the applicant and the county regarding this issue. Sediment -laden water will be allowed to travel through temporary pipe systems that are filled in after stabilization has occurred. The county will consider these systems as temporary slope drains since they are not permanent and carry sediment -laden water to settling facilities. However, temporary slope drains have maximum drainage areas of 5 acres. The county will grant a variation from this standard to allow the 6.3acre watershed proposed in this plan if the temporary storm line diameter is increased to 30': I also recommend increasing the slope of the pipe to further safeguard against clogging (though, this is not a requirement). Please also see the previous comment. 4. Please provide clearer language on the plan that the mass grading plan and the Stonefield Blvd. Plan is to be completed and stabilized prior to the start of this application. It is important to the implementation of this plan that these areas are stabilized. (Rev. 1) Please refer to comments B2 and B3. 5. For simplification of the design of the ESC plan, I recommend that the ESC plan for the cinema, parking lot for the cinema, and Stonefield Blvd. are combined into one plan, assuming all projects can be completed in 9 months. (Rev. 1) This comment was only a recommendation. 6. Please do not show the filterras on the erosion and sediment control sheets. (Rev. 1) Comment has been withdrawn. 7. Silt fence is needed on the west side of the sanitary sewer line from Sta. 10 +50 to 13 +50 in case the sediment basin has been removed. (Rev. 1) Comment has been addressed. 8. Please call out the depth of an adequate sump on inlet 66 on sheet C -19. (Rev. 1) Comment has been addressed. 9. Construction entrances are likely needed on the west and east sides of Stonefield Blvd. Otherwise, construction traffic must enter onto the Hydraulic Road to access the two construction areas on this plan, which is undesirable. (Rev. 1) Comment has been addressed. 10. Please provide a completed Bond Estimate Request Form to the county engineer to receive an ESC bond. (Rev. 1) A completed Bond Estimate Request Form has been received and an estimate will be provided shortly. C. Stormwater Management Plan Review (WPO- 2011 - 00055) 1. The set submitted to the county includes ESC and SWM sheets, but no WPO application was submitted. A review of both plans was performed anyway. Please provide a WPO application and $600 fee as soon as possible so that this comment letter can be tracked. (Rev. 1) Comment has been addressed. 2. Please provide an approval letter from Filterra that the current layout is acceptable to them. (Rev. 1) Comment has been addressed. 3. Every parcel that requires a stormwater management facility must sign a Stormwater Mana.eg ment Facility Maintenance Agreement with the County. Please complete this form and submit it to Ana Kilmer with a $17 recordation fee after reading the instructions online. Another agreement may be required for the master stormwater management plan approved under WPO- 2010 - 00023. (Rev. 1) Ana Kilmer has determined that the previously recorded Stormwater Facility Maintenance Agreement for the project covers all new facilities. 4. Please provide a completed Bond Estimate Request Form to the county to receive an additional SWM bond. (Rev. 1) A completed Bond Estimate Request Form has been received and estimates will be provided shortly. File: E2_ecp swm fsp_PBC _ sdp- 2011 -00047 The Shops at Stonefield -Regal Cinema.doc