HomeMy WebLinkAboutSDP201100024 Review Comments Final Site Plan and Comps. 2011-09-27i"
,. `IRGINZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: SDP-2011-00024, SOCA Field House — Final
WPO- 2011 - 00026, SOCA Field House — E &S & SWM
Plan preparer: McKee Carson (BTIWARI @MCKEECARSON.COM)
Owner or rep.: Belvedere Station Land Trust; Robert M Hauser & Stan C Manoogian TRS
Plan received date: 7 September 2011
Date of comments: 27 September 2011
Reviewer: Max Greene
The site development Plans for SOCA Field House submitted 7 September 2011 have received
Engineering Review and do not appear to meet Albemarle County minimum checklist items for
approval. Please adequately address the following comments for final approval:
A) Road and drainage plans (SDP- 2011 - 00024)
1) VDOT approval is required. Comments will be forwarded when received. [DM905]
2) Please provide more information on the Benchmark for the inspector /contractor. Description,
location, and any other information will help with inspections and site approvals.
3) VDOT designations could not be located on the plan sheets as stated in response letter.
a) Please label the entrances and curbing on the plan sheet to match the details provided.
b) Please show where each type of curb begins and ends for inspection and bonding purposes.
B) Stormwater Management and Mitigation Plan (WPO- 2011 - 00026)
1) Please submit a SWM Agreement to be recorded in the County Clerk's Office.
httD:// www.albemarle.ore /UDload /imaLes /forms center / departments /Community Development/for
ms/En ineering and WPO Forms/Plan Review -
_Stormwater_ Management _BMP_ Facilities _ Maintenance_Agreement.pdf
http:// www.albemarle.org/upload/images /forms center /departments /Community Development/for
ms/En ing eering_and_WPO_Forms/Plan_Review_-
Stormwater Management BMP Facilities Maintenance Agreement Procedures.0df
You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext.
3246 for further information on bonding procedures and Maintenance Agreements.
C) Erosion Control Plan (WPO- 2011 - 00026)
1) Temporary Paved Construction Entrance detail does not appear correct. Please use the detail
found in the Albemarle County Design Standards Manual:
http: / /www. albemarle. org/upload/images /forms_ center / departments /community_ development /for
ms /design standards manual /Albemarle County Design Standards Manual 02- 12- 2010.pdf
2) Please replace the gravel curb inlet protection detail with one that has an emergency overflow
capability. The detail shown is subject to frequent clogging and subsequent flooding or damage to
surrounding areas.
Once these comments have been addressed, please submit 3 copies of the revised plans, calculations, and
Engineering Review Comments
Page 2 of 2
narratives to Current Development Engineering.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review
comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to
schedule an appointment.
[17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be
included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the
omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as
provided under paragraph (B).
File: CDDE2_fsp,esc,swm_MRG_Soca Field House.doc