Loading...
HomeMy WebLinkAboutWPO201100063 Review Comments Bond Estimate 2011-09-08BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Airport Road Office Plaza PROJECT NUMBER: WPO201100063 DATE OF ESTIMATE: 09/01/11 ESTIMATE BY: MRG BASED ON: Approved E &SC Plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 5.2 1500 7800 SILT FENCE LF 1000 5 5000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 900 3 2700 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0.9 1000 900 SEDIMENT BASIN 1 ACRES 2.95 1000 2950 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 12 200 2400 OUTLET PROTECTION EA 1 200 200 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 1 30 30 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 23980.00 project management 3597.00 subtotal 27577.00 CONTINGENCY LS 10% 2757.70 TOTAL 30334.70 BOND AMOUNT REQUIRED 30400.00