Project:
Earlysville Service Center
Plan preparer:
David Wyant, P.E.
Owner or rep.:
WHYTE, M O
Plan received date:
21 September 2011
Date of comments:
30 September 2011
Reviewer:
Max Greene
�� OF A
i"
A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902.4596
SDP201100062
[NFLSJI6 @GMAI1L.00M]
[contact info. unknown]
Fax(434)972 -4126
The site development Plans (SDP201100062) submitted 21 September 2011 have received Engineering Review
and do not appear to meet Albemarle County minimum checklist items for approval. Please adequately address
the following comments for final approval:
Road and drainage plans (SDP200400042)
From PreliminM plan approval:
1) Date and source of the topographic information: All topography should be at least visually field verified by the
designer within the last year [18- 32.6.6, 14 -302, Policy for date]
2) Provide revised Simple Method Spreadsheet illustrating the pre - development and post - development removal rates of
the proposed site. The spreadsheet submitted appears to be incorrect. The drainage area to be used must be the
proposed site, not the entire property of 11.83 acres. In addition, provide a pre- and post - development drainage area
map with acreage.
3) Professional seal must be signed and dated. [18- 32.6.1]
4) VDOT approval is required. Comments will be forwarded when received. [DM905]
Stormwater Management and Mitigation Plan
5) Stormwater review fee and application are required for review. Please see attached link:
hllp:// www.albemarle.org /upload/images /forms center /departments /Community Development/forms/Engineering an
d_WPO_Forms/WPO_- _Application_ Erosion _ &_ Sediment _ Control_Plan.pdf
Erosion Control Plan
6) Erosion and sediment control fee and application are required for review. Please see attached link:
hllp:// www.albemarle.org /upload/images /forms center /departments /Community Development/forms/Engineering an
d_WPO_Forms/WPO_- _Application_ Erosion _ &_ Sediment _ Control_Plan.pdf
Once these comments have been addressed, please submit 2 copies (add 1 more copy if VDOT needs to review, and 1
more if mass - grading that Planning needs to review) of the revised plans, calculations, and narratives to Current
Development Engineering along with the required review fee and transmittal form.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please
contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment.
[17- 204.fJ An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be
deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is
informed of the omitted information as provided under paragraph (B).