Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201100055 Review Comments Bond Estimate 2011-09-29
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: Stonefield (Cinema) W PO- 2011 -00055 09/29/11 PBC Plans signed 8 -29 -2011 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 10.8 1500 16200 SILT FENCE LF 3740 5 18700 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 1876 3 5628 TEMPORARY SLOPE DRAIN LF 0 20 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 30 200 6000 OUTLET PROTECTION EA 1 200 200 EC -2 & 3 DITCH PROTECTION LF 320 10 3200 RIP -RAP LF 72 55 3960 CHECK DAMS SQ.YD. 0 30 0 24" HDPE PIPE LF 252 39.9 10054.8 30" HDPE PIPE LF 364 49.35 17963.4 STORMWATER STRUCTURE EA 3 2000 6000 ROW DIVERSION LF 50 20 1000 PAVED CONSTRUCTION ENTRANCE EA 4 2000 8000 subtotal 96906.20 project management 14535.93 subtotal 111442.13 CONTINGENCY LS 10% 11144.21 TOTAL 122586.34 BOND AMOUNT REQUIRED 122600.00 last revised:12 -5 -01