Loading...
HomeMy WebLinkAboutSUB201000090 Review Comments Final Plat 2011-11-08� pF AL �'IRGI1�1� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 November 7, 2011 Ben Broker, LS The Engineering Groupe Inc. 13580 Groupe Drive, Suite 200 Woodbridge, VA. 22192 RE: SUB - 2010 -90, Briarwood (Phases IA -2, 113-2 & 8) Final Plat Dear Sir or Madam: The Department of Community Development hereby grants administrative approval to the above referenced final subdivision plat. The final plat is valid for five (5) years from the date it is approved pursuant to Section 14 -228 of Chapter 14 of the Albemarle County Code, provided that the subdivider diligently pursues approval of the final plat. After three (3) years (November 7, 2014) following final plat approval, the agent may, after ninety (90) days' written notice provided by certified mail to the subdivider, revoke the approval upon a specific finding of facts that the subdivider failed to diligently pursue approval of the final plat. Please address all of the requirements and conditions listed below and submit eight (8) tentative plat copies to the Department of Community Development. This letter must be submitted with the tentative plats, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plat will be denied. Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated applications and fees must also be submitted with the eight (8) tentative Plats. Once the tentative plat is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plat. Any further responses must be made directly to each department /division /agency that has further comment. After all aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with the Planner that you may submit the final plat mylar or other media original and any remaining fees to the Department of Community Development. Assuming that the final plat reflects all tentative approvals, signing of the plat will occur within four days. The final plat will be subject to all final plat requirements (Subdivision Ordinance Section 14.206), in addition to the following conditions. The Department of Community Development shall not accept submittal of the final plat for signature until tentative approvals for the following conditions have been obtained. The final plat shall not be signed until the following conditions are met: Planning Services approval to include: ❑ [14 -303F] COMMENT: Per proffer 4, one tot lot shall be provided in Phase 113. Please revise Sheet 2 of 9 to indicate the location of the proposed tot lot in Phase 1B. ❑ [14 -303G] COMMENT: Per Proffer #1 (which supercedes the ordinance) recreation areas must be conveyed to the Homeowners Association. For this reason, they must be platted separately, unless you decide to dedicate all open space to the HOA, in which case they can be just part of the common open space that gets dedicated (see comment #19 below). You may include maintenance of the tot lots in the maintenance agreement for the private streets (and common open space if it is dedicated to the HOA). ❑ [14 -317] Instrument evidencing maintenance of certain improvements. COMMENT: Per comments above, please submit maintenance agreements for County Attorney review, for tot lot, open space, and road maintenance, as well as any documents required by Engineering. ❑ [14 -414, 430] Public water and sewerage, Dedication of water and sewerage system. COMMENT: ACSA approval is required. Provide verification once approval is obtained. ❑ [Sec. 14 -417, 43 1] Stormwater management and drainage control facilities, easements for facilies for Stormwater management and drainage control. COMMENT: Engineering approval is required. ❑ [Sec. 14 -426, 428] Dedication of land for public use, Dedication of streets. COMMENT: VDOT approval is required. Provide verification once approval is obtained. ❑ [Sec. 14- 434,435, 435.1, 436] Completion of on -site improvements required prior to plat approval, surety for maintenance of streets until accepted into state system, release of surety. COMMENT: Streets and required improvements must be built or bonded prior to final plat approval. Please see Engineering comments for more information concerning request for bond estimate, etc... ❑ [14- 234.C.3] COMMENT: The private street(s) must be owned by the Homeowners Association. Note #15, Sheet 1, needs to be revised to reference a time at which the conveyance will occur. Remember, a maintenance agreement is required. Please contact Brent Nelson at 434 - 296 -5832, x 3438 if you have questions or require additional information. Sincerely, Brent W. Nelson Planner Planning Services File: SUB - 2010 -90 cc: Woodbriar Associates P.O. Box 5548 Charlottesville, VA. 22905