HomeMy WebLinkAboutWPO201100055 Review Comments Erosion Control Plan 2011-09-28Philip Custer
From: Philip Custer
Sent: Wednesday, September 28, 2011 4:04 PM
To: dhornton@wwassociates.net
Cc: 'Herbert F. White III, P.E.'; rumberger @wwassociates.net
Subject: RE: Stonefield Regal Revisions 2 of 2
All Cinema engineering comments have been addressed. However, the site plan cannot be approved until the Stonefield
Blvd. Road plan is approved. As of now, there are two items left to be addressed to satisfy county engineering: the turn
lane note and VDOT approval.
I owe you (and Edens & Avant) ESC /SWM Bond amounts and a number of sets needed for engineering inspectors.
From: David Thornton fmailto :dthorntonCalwwassociates.net1
Sent: Wednesday, September 28, 2011 11:52 AM
To: Philip Custer
Cc: 'Herbert F. White III, P.E.'; rum berger(a)wwassociates.net
Subject: Stonefield Regal Revisions 2 of 2
Phil,
I had to break up the email due to file sizes. Here is the 3rd revised slip sheet. Thanks.
David A. Thornton, EIT
Project Engineer
W
off
PsOiN ors
No
I'1.R'NNER S
ASSOCIATES
Office Phone: 434.960.0606
Main: 434.984.2700
Fax: 434.978.1444
3040 Avemore Square Place
Charlottesville, VA 22911
dthornton&wwassociates.net
www.wwassociates.net