Loading...
HomeMy WebLinkAboutWPO201100055 Review Comments Erosion Control Plan 2011-09-28Philip Custer From: Philip Custer Sent: Wednesday, September 28, 2011 4:04 PM To: dhornton@wwassociates.net Cc: 'Herbert F. White III, P.E.'; rumberger @wwassociates.net Subject: RE: Stonefield Regal Revisions 2 of 2 All Cinema engineering comments have been addressed. However, the site plan cannot be approved until the Stonefield Blvd. Road plan is approved. As of now, there are two items left to be addressed to satisfy county engineering: the turn lane note and VDOT approval. I owe you (and Edens & Avant) ESC /SWM Bond amounts and a number of sets needed for engineering inspectors. From: David Thornton fmailto :dthorntonCalwwassociates.net1 Sent: Wednesday, September 28, 2011 11:52 AM To: Philip Custer Cc: 'Herbert F. White III, P.E.'; rum berger(a)wwassociates.net Subject: Stonefield Regal Revisions 2 of 2 Phil, I had to break up the email due to file sizes. Here is the 3rd revised slip sheet. Thanks. David A. Thornton, EIT Project Engineer W off PsOiN ors No I'1.R'NNER S ASSOCIATES Office Phone: 434.960.0606 Main: 434.984.2700 Fax: 434.978.1444 3040 Avemore Square Place Charlottesville, VA 22911 dthornton&wwassociates.net www.wwassociates.net