HomeMy WebLinkAboutWPO201100027 Review Comments Erosion Control Plan 2011-11-09� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Plan preparer:
Owner or rep.:
Plan received date
Date of comments:
Reviewer:
Buckingham Circle Water Project
Heather A. Campbell, P.E.
Alexander J. Morrison, ACSA
31 October 2011
10 November 2011
Max Greene
[WP020 1 1 000271
[hcampbell @ dewberry.com]
[amorrison @ serviceauthority.org]
The Water Protection Plans (WP0201100027) submitted 31 October 2011 have received
Engineering Review and do not appear to meet Albemarle County minimum checklist items for
approval. Please adequately address the following comments for final approval:
The following comments are to clarify the previous comments for approval.
1. Please provide the General Construction Notes for Erosion and Sediment Control. Please refer the
Design Standards Manual. This comment appears adequately addressed with this submittal.
2. Please provide a utility stream cross symbol (USC) on the E &S plan. This comment appears
adequately addressed with this submittal.
3. Please provide Dust Control (DC). This comment appears adequately addressed with this
submittal.
4. Please provide a construction entrance (CE) on the plans. A symbol on the E &S plan will suffice.
Please show the Albemarle County Temporary paved construction entrance detail on the
plan sheet. The WPO inspector will work with the contractor to ensure no mud tracks onto
the paved state road. State roads cannot be utilized as a temporary paved construction
entrance without prior written approval from VDOT.
5. Please provide a staging and parking area. If not, please specify that all construction equipments
and vehicles will not be on site over night. This comment appears adequately addressed with
this submittal. However, the staging area is very far from the work that is not under
existing pavement.
6. Silt fence cannot be perpendicular to the contours. Please show how the area will be protected
in accordance with VESCH. This office recommends Std. & Spec. 3.20 silt fence check
dams and/or a sediment trapping device located at the bottom of the slope.
7. In addition to the previous comments, the temporary construction easement between
Liberty Hill subdivision and Buckingham Circle Subdivision doesn't appear adequate for
the contractor to navigate due to the size and amount of existing trees. In addition, there
appears to be a 10 gap between the existing easement for the 4" line and the new temporary
grading easement for the 8" line. Please make sure the contractor will not trespass onto
unapproved areas. Additional temporary construction easements are recommended.
No review fee was received for this review. Please submit 2 review fees with next submittal.
Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations,
and narratives to Albemarle County Engineering along with the required review fee and transmittal form.
Engineering Review Comments
Page 2 of 2
Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these
review comments. Please contact Max Greene at 434 - 296 -5832 (ext. 3283) or mareene @albemarle.org to
schedule an appointment.
[17- 204.fj An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be
included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the
omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as
provided under paragraph (B).
\\ Cob- dts01 \CityViewLnk\Docs \2011 \WPO \WPO201100027 - Buckingham Circle Water Project \CDDE2_esc_MRG_Buckingham Circle Water
Project.doc