Loading...
HomeMy WebLinkAboutSUB201100126 Review Comments Preliminary Plat 2011-11-14`J I1 pJ11 �11'] �J, r, �) ifilly Service Authority TO: Ellie Ray FROM: Alexander J. Morrison, Civil Engineer DATE: November 14, 2011 RE: Site Plan Technical Review for: SUB201100126: Foothills Crossing — Preliminary TMP# 056KO- 00- 00 -000A1 The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. An 10 inch water line is located approximately 200 distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 12 inch sewer line is located approximately on site distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: • Note on cover sheet: All easements are to be centered on the as -built locations for water and sewer utilities. • Ensure all proposed fire hydrant locations have an easement. • Show existing ACSA sewer and easements on property with D.B. and Page. • Show existing RWSA sewer and easement on property with D.B. and Page. • Show easements for proposed water meter locations. • Final water and sewer plan required for review prior to construction approval. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthority.org Pj1J �]J'] �1 � J �) filly Service Authority •Cng The Albemarle County Service Authority (ACSA) has no technical comments on the SUB being reviewed. Engineering comments are usually reserved for the site plan review stage. Subdivision plats should correctly show ownership of properties and existing easements. Recordation of new easements should occur before dedication to and acceptance by the ACSA. The ACSA can review the proposed subdivision plat and determine if it is included in the jurisdictional area for water and /or sewer service. Water and /or sewer connections to the ACSA system are allotted on a first come, first served basis at the time connection fees are paid. The ACSA does not reserve capacity in its system for a specific project. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthority.org