Loading...
HomeMy WebLinkAboutWPO201100059 Review Comments Erosion Control Plan 2011-11-29Philip Custer From: Philip Custer Sent: Tuesday, November 29, 2011 6:47 PM To: 'TGALLAGHER @EDENSANDAVANT.COM'; Herbert F. White III, P.E. Cc: Bill Fritz; Ana Kilmer Subject: Engineering Review of Stonefield Towncenter Attachments: E3_swm fsp_PBC_wpo- 2011 -00059 sdp- 2011 -00054 Stonefield Town Center.doc Good evening, I have completed the third engineering review of the final site, swm, and esc plans for Stonefield Towncenter (WPO- 2011 -00059 and SDP - 2011 - 00059), received 7 November 2011. The ESC plan is approved on the condition that STR Temp -1 is upgraded to a 36" pipe. The SWM plan is approved. There are still a few site plan comments left to be addressed, however. Please refer to the attached letter for these comments. Because there are only a few left to be addressed, I can review these via pdf submittals if you want to upload the few modified sheets to your FTP site. I would prefer to review all changes at once, rather than each individual comment is addressed. The WPO bonds have been computed. The ESC bond is set at $135,800. The SWM bond is set at $438,700. To post these bonds, please contact Ana Kilmer after all comments have been addressed and the site plan has been signed. Before a grading permit can be issued, the Stormwater Management Facility Maintenance Agreement must be recorded. After it has been determined that the site plan is ready for signature, please provide 5 copies of the plan to me to pass along to the WPO inspector. If you do not wish to provide full sets, please contact me ahead of time and I can let you know what sheets will be needed. Please let me know if you have any questions. Thanks, Phil 296 -5832 x3072