HomeMy WebLinkAboutWPO201100088 Review Comments Erosion Control Plan 2012-03-14 (3)� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Stonewater; WPO- 2011 -00088
Plan preparer: Mr. Scott Collins, PE; Collins Engineering
Owner or rep.: Rio Road Holdings, LLC
Plan received date: 28 October 2011
Date of comments: 5 December 2011
Reviewer: Phil Custer
The first submittal of the ESC and SWM plans for Stonewater (WPO- 20 1 1 - 0008 8), received on 28
October 2011, has been reviewed. The following comments must be addressed to receive county approval.
A. General Review Comments
1. Please identify the date and source of topography.
B. Erosion and Sediment Control Review Comments
1. Except for the eastern roadwork where updated survey information appears to take into
account the work already performed by the Treesdale contractor, these sheets match those
approved in WPO- 2010 - 00011. The only purpose for this submittal appears to be to
separate two projects, Treesdale and Stonewater, that were fused together for a short term
convenience one or two years ago.
The county has reviewed and approved previous plans with the assumption that these two
projects were to be developed in harmony. The previous application, WPO- 2010 -00011
contained all of the measures necessary to construct everything needed for both
developments. From October of 2010 til the date of this letter, work could have begun on
the Stonewater subdivision without any step other than the paper work necessary to link
Rio Road Holdings, LLC to the bond that had been posted by Treesdale.
With one project ready to convert the facility to a permanent stormwater BMP and one
project wanting to prolong the utilization of the basin, the county is in the middle of two
property owners that are now on different timelines. But because county engineering is
tasked with reducing overall construction times to as close to nine months as possible [17-
207.B.2], we cannot allow the use of this basin for ESC purposes by the Stonewater
Subdivision unless the Board of Supervisors grants approval of the extension to the
construction timeline. If the Board of Supervisors grants this approval, the maintenance
and bonding of this basin will need to be worked out at that time. However, it is
anticipated that the Treesdale development will be ready to convert the facility at that time
and demobilize so Rio Road Holdings, LLC will then be responsible for the conversion of
the facility. If the applicant chooses to modify the ESC plan for the Stonewater
development so the basin is not utilized, Treesdale will be free to convert the facility to the
extended detention facility, as designed, and a small SWM bond will be required of the
Stonewater development for repair of the BMP in the event damage to it occurs from
siltation.
Albemarle County Community Development
Engineering Review Comments
Page 2 of 2
2. Please move the limits of disturbance and the construction entrance out of the areas of the
site that are about to be completed by the Treesdale development. Traffic to /from
Treesdale must not travel through an active construction area. Please move the limits of
construction, including staging and parking areas, west of the soon -to -be completed roads.
3. Please update all county construction notes. The current set in this application is several
years old.
4. Please identify how the sanitary sewer line is to be constructed across the stream. It will
be necessary for construction equipment to access the northside of the stream. This must
also be identified. Please also provide an approval letter from the Army Corps of
Engineers.
5. Why doesn't the drainage area used for the sediment basin calculations match the
stormwater drainage area on Sheet SWM -1? I would expect the drainage areas to be the
same.
6. The construction sequence references sheet SWM -3 which has not been included in this
set.
7. In the field, the three 9" orifices are currently opened. Is there enough dry storage to the
387.2 elevation for this to be the case or must these openings be sealed until conversion?
8. Please show and label the easement needed to construct the work shown on the
Stonehenge property.
9. This work will need to be bonded by Rio Road Holdings, LLC. The bonding procedure
will be dependent on how the applicant wishes to address Comment B.1.
C. Stormwater Management Review Comments
1. A fee was provided for the review a Stormwater Management Plan. But all sheets in this
set appear to be exactly those incorporated in WPO- 2010 - 00011. Since nothing was
modified, a review was not performed. Therefore, there is a $300 credit in this
application. Please let me know if you want this refunded now or want to save it for the
next ESC submittal. That SWM plan, WPO- 20 1 0 - 000 1 1, is still valid and may be used by
the Stonewater Development after successful stabilization. Please remove all SWM sheets
from this set to avoid confusion.
2. The applicant must sign a Stormwater Management Facility Maintenance Agreement.
Please submit this completed agreement to Ana Kilmer with $17 recordation fee after
reviewing the instructions online. The agreement must refer to the original SWM
application, WPO- 2010 - 00011.
3. A portion of this work will need to be bonded by Rio Road Holdings, LLC. The bonding
procedure will be dependent on how the applicant wishes to address Comment B.1. As
mentioned in Comment B.1, a modest SWM bond will be held by the county if
construction of Stonewater development occurs after conversion of the enhanced,
extended detention facility.