Loading...
HomeMy WebLinkAboutSP201100029 Review Comments Special Use Permit 2012-01-20GF A� vIRGINIe' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 January 23, 2012 Stephen Waller 536 Pantops Center- PMB #405 Charlottesville, Virginia 22911 RE: REVISED COMMENT LETTER for SP 2011 - 00029, Keswick Tower- Verizon Wireless Tier III PWSF Dear Mr. Waller: Thank you for your recent submittal of a Special Use Permit to amend the existing Special Use Permit SP2004- 00039. Modifications have been requested to install three (3) new antennas and the relocate three (3) existing antennas in an existing array on the tower. The new configuration also proposes to utilize an alternative mounting system which increases the maximum standoff distance to 24 ". The information provided with your initial application for the SP has been reviewed by the Department of Community Development, including the Planning Division, Engineering, RWSA, and VDOT. Comments from reviewers are summarized below. Planning The Planner for the Planning Division of the Albemarle County Department Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) 1. [5.1.40(c)3i] The total number of arrays of antennas attached to the existing structure shall not exceed three (3), and each antenna proposed to be attached under the pending application shall not exceed the size shown on the application, which size shall not exceed one thousand one hundred fifty two (1152) square inches. On the plan provide a note or diagram with the size of the antenna clearly denoted. If the size of the antennas is greater than 1152 square inches a request for a modification will be required. 2. [5.1.40(c)3ii] No antenna shall projectfrom the structure beyond the minimum required by the mounting equipment, and in no case shall any point on the face of an antenna project more than twelve (12) inches from the existing structure. The proposal denotes the maximum standoff distance as 18 — 24" from the tower, revise the plan to depict this SP 2011 -029 Keswick Tower - Verizon Wireless Tier III PWSF 2 through a note or diagram. 3. [5.1.40(c)3iii] Each antenna and associated equipment shall be a color that matches the existing structure. For purposes of this section, all types of antennas and dishes regardless of their use shall be counted toward the limit of three arrays. On the plan provide a note which states the antennas and the associated equipment shall be a color that matches the existing structure. 4. On sheet C -3 the existing elevation depicts two (2) antennas at 90' height and the notation lists three (3) existing antennas; the proposed elevation at the same height shows four (4) antennas and the notation lists six (6) (3 relocated and 3 proposed). Per the November email mentioned above, the depictions and notations do not match, to avoid confusion revise the site plan to assure both the depiction and the notation match. 5. Also, on sheet C -3 the existing elevation depicts 6 antennas at 110' height; the proposed elevation at the same height shows 4 antennas. Perthe November email mentioned above these antennas are not part of the proposal and are not subject to change. Regardless, to avoid confusion revise to assure correctness between both elevations. Please contact Christopher P. Perez at the Department of Community Development at 434 -296- 5832 ext. 3443 for further information. Architectural Review Board The following comments have been provided by Margaret Maliszewski of the Planning Department: 1. The proposed ground equipment is no taller than the tallest existing equipment. Consequently, no additional impact on the ECs is expected. However, the evergreen trees surrounding the fenced area contribute to the screening of the site. Those trees should be shown on the plan. Show the existing screening trees on the plan. 2. The project description indicates that the antennas will be painted to match the tower. Include a note on the plans indicating that new and moved antennas and other new equipment on the tower will be painted to match the tower. 3. The applicant has indicated that the maximum stand -off distance for the antennas is 24 ", which is 12" beyond the standard - maximum. Given the size of the tower and the distance from the ECs, that additional 12" is not expected to be noticed from the ECs and it is not expected to create additional negative visual impact. Indicate graphically on the plans the maximum stand -off distance and note where the measurement is taken. Please contact Margaret Maliszewski at the Department of Community Development at 434 -296- 5832 ext. 3276 for further information. SP 2011 -029 Keswick Tower - Verizon Wireless Tier III PWSF 3 ACSA Albemarle County Service Authority reviewed the application and had no comments Please contact Alex Morrison at ACSA at 434 - 977 -4511 ext. 116 for further information. RWSA Rivanna Water and Sewer Authority reviewed the application and had no comments. Please contact Victoria Fort at RWSA at 434 - 977 -2970 ext. 205 for further information VDOT Virginia Department of Transportation reviewed the application and had no comments. Please contact Joel DeNunzio, PE at ( ioel .denunzio @vdot.virginia.gov) for further information Action after Receipt of Comments After you have read this letter, please take one of the actions identified on "Action After Receipt of Comment Letter" which is attached. Resubmittal If you choose to resubmit, please use the attached form. There is no fee for the first resubmittal. The resubmittal date schedule is provided for your convenience. Notification and Advertisement Fees Recently, the Board of Supervisors amended the zoning ordinance to require that applicants pay for the notification costs for public hearings. Prior to scheduling a public hearing with the Planning Commission, payment of the following fees is needed: $ 246.90 Cost for newspaper advertisement $ 207.05 Cost for notification of adjoining owners $ 453.95 Total amount due prior to Planning Commission public hearing Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing needed. $ 246.90 Additional amount due prior to Board of Supervisors public hearing $ 700.85 Total amount for all notifications Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. SP 2011 -029 Keswick Tower - Verizon Wireless Tier III PWSF 4 Feel free to contact me if you wish to meet or need additional information. My email address is cperez @albemarle.org. Sincerely, Christopher P. Perez Senior Planner CC: Maynard Sipe 123 East Main Street Charlottesville, Virginia 22902 enc: Action After Receipt of Comments Resubmittal Schedule Resubmittal Form DEPARTMENT OF COMMUNITY DEVELOPMENT �fllt�tlf'I '.. • . ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date.as published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org iri the "forms" section at the Community Development page. Be.sure to include the resubmittal form on the last page of your comment letter with your submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter, you need to request an indefinite deferral. Please provide a written request and state your justification for requesting the deferral. (indefinite deferral means that you intend to resubmit /request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. After outstanding issues have been resolved and /or when you are ready to request a public hearing, staff will set your public hearing date for the Planning Commission in accordance with Page 1 of b Devised 4 -25 -11 eke the Planning Commission's published schedule and as mutually agreed by you and the County. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please rememberthat all resubmittals must be made on or before a resubmittal date. By no later than twenty -one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment letter will contain the actual fees you need to pay. Payment for an additional newspaper advertisement is also required twenty -two (22) days prior to the Board of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Public Hearings form. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application. If at any time you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is made within 10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees may be paid in cash or by check and must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. Page 2 of 6 Revised 4 -25 -11 eke FEE SCHEDULE FOR ZONING APPLICATIONS A. For a special use permit: 1. Additional lots under section 10.5.2.1; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Eachadditional resubmittal ........................................ ............................... ...................$500.00 2. Public utilities; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Eachadditional resubmittal ................................ ---- ... ... .... . ........ .......... . ....... .. ...... ......$500.00 3. Day care center; application and first resubmission Fee............................................................................. ............................... .....................$1,000.00 Each additional resubmittal ............................. ......I........... .......... ........................$500.00 4. Home occupation Class B; application and first resubmission Fee....... ............................... . ............................... ............................... .....................$1,000.00 Eachadditional resubmittal ....................................... ............................... ........................$500.00 5. 5. Amend existing special use permit; application and first resubmission Fee...... ...................................................................... ............................... ......................$1,000.00 Each additional resubmittal ........................................ ..........I.................... .......................$500.00 6. Extend existing special use permit; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Eachadditional resubmittal ..:.................................... ..............................: ...........:............$500.00 7. All other special use permits; application and first resubmission Fee..................................:......................................... ............................... ......................$2,000.00 Each additional resubmittal ........................................................... ............................... $1,000.00 8. Deferral of scheduled public hearing at applicant's request Fee............................................................................. ............................... ........................$180.00 B. For amendment to test of zoning ordinance: Fee................................ . .... . ...... .................................... ....-- ............. . .................................. $1000.00 C. Amendment to the zoning map: 1. Less than 50 acres; application and first resubmission Fee................... ............................... ................ ...... ............................... .............$2,500.00 2. Less than 50 acres; each additional resubmission Fee.......................................................................... ............................... *— *..................$1,250.00 3. 50 acres or greater; application and first resubmission Fee............................................................................. ............................... .....................$3,500.00_ 4. 50 acres or greater; each additional resubmission Fee.......................................................:.................... ............................... ......................$1,750.00 5. Deferral of scheduled public hearing at applicant's request Fee.............................................................................. ............................... .......................$180.00 D. Board of Zoning Appeals: 1. Request for a variance or sign special use permit Fee................: ........................................................ ............................... .......................$50'0.00 2. For other appeal s to the board of zoning appeals (including appeals of zoning administrator's decision) — Fee (to be refunded if the decision of the zoning administrator is overturned) .......$240.00 N. Required notice: 1. Preparing and mailing or delivering up to fifty (50) notices: Fee............................................................................. ............................... ........................$200.00 plus the actual cost of first class postage- 2. Preparing and mailing or delivering, per notice more than fifty (50): Fee.......................... ............................... ...................... ..........................:.... ..........................$1.00 plus the actual cost of first class postage . 3. Published notice: Fee ............. ............................... ..........:....................... ............................... .........................Actual cost Page 3 of 6 Revised ¢25 - -11 eke 2012 Flow of Submittal - Legal Ad Payments and Public Hearings Planning Commission Public-Hearing Payment Deadline Legal Ad Run 1 Legal Ad Run 2 PC Date ::::'i2�"191'1:1 .... ... ....................... ::::::::::: ::'f2l2 i =i: 1/2/12 1/10/12 =tl �i 1/9/12 1116112 1/24/12 1/9/12 1123112 1130112 2/7/12 216/12 2/13/12 2120/12 2/28/12 2113112 2120/12 2127112 3/6/12 2127/12 3/5/12 3/12/12 3/20/12 3112/12 3119/12 3126/12 4/3/12 412/12 4/9/12 4116/12 4/24/12 4116/12 4123/12 4/30/12 5/8/12 4/30/12 5/7/12 5/14/12 5/22/12 5114/12 5121112 5128112 6/5/12 1:11:l�li6f .,. WIN,. . b 6/4/12 6/11/12 6/19/12 6125/12 712112 7/9/12 7/17/12 719/12 7/16/12 7/23/12 7/31/12 7116112 7123/12 7/30/12 8/7/12 7130112 8/6/12 8/13/12 8/21/12 8120/12 8/27/12 9/3/12 9/11/12 8/20/12 + MISS 9110/12 9/17/12 9/25/12 9117/12 9124/12 10/1/12 10/9/12 1011/12 10/8/12 10/15/12 10/23/12 10/15/12 10/22/12 10/29/12 11/6/12 10/22/12 10/29/12 11/5/12 11/13/12 11/12/12 11/19/1 2 11/26/121 12/4/12 11/26/12 12/3/12 12/10/12 12/18/12 TENTATIVE Board of Supervisors Public Hearing 11/1/2011 P. 9 of 9 Payment Deadline Legal Ad Run 1 Legal Ad Run 2 BOS Date 12/12/11 12/19/11 12/26/11 1/4/12 12/19/11 12/26111 112/12 1/11/12 1/9/12 1/16/12 1/23/12 2/1/12 1/23/12 1/30112 2/8/12 2/13/12 2120/12 2/27112 3/7/12 2/27112 315112 3/14/12 3/12/12 3/19/12 3/26/12 4/4/12 3/19/12 3/26/12 4/2112 4/11/12 419/12 4/16/12 4/23112 5/2/12 4116/12 4/23/12 4130112 5/9/12 5114112 5/21/12 5/28/12 6/6/12 5/21/12 5/28112 6/4112 6/13/12 6/11/12 6/18/12 6125112 6/18/12 6/25/12 712/12 7/11/12 719/12 7/16/12 7123/12 8/1/12 7116112 7/23/12 7130112 8/8/12 8/13/12 8/20/12 8127/12 9/5/12 8120/12 8/27112 913112 9/12/12 9110/12 9/17112 9/24112 10/3/12 9/17112 9124/12 10/1/12 10/10/12 10115112 10/22/12 10/29/12 11/7/12 10/22/12 10129/12 11/5/12 11/14/12 11/12/12 .11/19/12 11 /26/12 12/5/12 11/19/12 11/26/12 12/3/12 12/12/12 2012 Submittal and Review Schedule Special Use Permits and Zoning Map Amendments Resubmittal Schedule Written Comments and Earliest Planning Commission Public Hearing* Resubmittal Dates Comments to applicant for decision on whether to proceed to Public Hearing Legal Ad Deadline and Decision for Public Hearing ** Planning Commission Public Hearing No sooner than* Monday Wednesday Monday Tuesday �`wDecl,9st1i3, "I Jan 18 Feb 6 Feb 28 Tue Jan 3 Feb 1 Feb 13 -Mar 6 Tue Jan 17 Feb 15 Feb 27 Mar 20 Feb 6 Mar 7 Mar 12 Apr 3 Tue Feb 21 Mar 21 Apr 2 Apr 24 Mar 5 Apr 4 Apr 16 May 8 Mar 19 Apr 18 Apr 30 May 22 Apr 2 May 2 May 14 Jun 5 Apr 16 May 16 May 28 Jun 19 May 7 Jun 6 Jun 25 Jul 17 May 21 Jun 20 Jul 9 Jul 31 Jun 4 Thu Jul 5 Jul 16 Aug 7 Jun 18 Jul 18 Jul 30 Aug 21 Jul 2 Aug 1 Aug 20 Sep 11 Jul 16 Aug 15 Tue Sep 4 Sep 25 Aug 6 Sep 5 Sep 17 Oct 9 Aug 20 Sep 19 Oct 1 Oct 23 Tue Sep 4 Oct 3 Oct 15 Nov 6 Sep 17 Oct 17 Oct 22 Nov 13 Oct 1 Oct 31 Nov 12 Dec 4 Oct 15 Nov 14 Nov 26 Dec 18 Nov 5 Dec 5 Dec 17 a 'kan,g803�f „ c Nov 19 Dec 19 x ,),ant 3i :rt ',G''�7an�2.0fl1, 3 n 3 D2 , �FeDec Dec 17 £ Q b�62 <; FA Dates shown in italics are changes due to a County holiday * The reviewing planner will contact applicant to discuss comments of reviewers and advise that changes that are needed are significant enough to warrant an additional submittal or advise that the the project is ready for a public hearing. If changes needed are minor, the planner will advise that, the project go to public hearing. ** The legal ad deadline is the last date at which an applicant can decide whether to resubmit or go FOR OFTICE USE ONLY SP # or ZMA # Fee Amount Date Paid Bywho? Receipt# Ck# By Resubmittal of information for Special Use Permit or Zoning Map Amendment Y» PROJECT NUMBER: PROJECT NAME: ❑ Resubmittal Fee is Required ❑ Per Request ❑ Resubmittal Fee is Not Required Community Development Project Coordinator Signature Name of Applicant Date Signature FF.F,C Phone Number Date Resubmittal fees for Special Use Permit — original Special Use Permit fee of $1,000 ❑ First resubmission FREE ❑ Each additional resubmission $500 y }..5 =4i'•S;�' N. y:'- t�c3RYJ'—r 7x�a� Ste^%. f— iJM' k'"y 1.-'� T� �µy�{+n =11112 ;2�i. �_�y} A�li�'. ...�xW.�i.�'.'��Tii t �.4EIC' Resubmittal fees for original Special Use Permit fee of $2,000 ❑ First resubmission F= ❑ Each additional resubmission $1,000 Resubmittal fees for original Zoning Map Amendment fee of $2,500 ❑ First resubmission FREE ❑ Each additional resubmission $1,250 p �$ry 4 iAF.ccryv Sp , "ffl, � p IPr ^CFr JAI —xl'✓'E46�5.'.s+i1r I�RLC'A'F.i'� TC: YC i Y."'. wpFs.ek. # Z!Y]k�'s+Y�or._A'12Y.wPr"1..._ .SKISYrrkWW.T:tz"tiU.^.w�"...CK .kYu J` l . ._C Resubmittal fees for original Zoning Map Amendment fee of $3,500 ❑ First resubmission I.FREE ❑ Each additional resubmission I $1,750 �5m. `b.SY���2�i����`�,fE��Q�.htrr. iH��s�?w�{"'"Yi4'3r' _ e1. _ ,'y:Jrdr��f..r`44,a .f t- �f�r. ±, ���x�'%S•M�� 4`.Gr_�'L��i����.,���'.'. Cav3v:.4w..6�.hib!"��J� - _'�"�u $180 ❑ Deferral of scheduled public hearing at applicant's request —Add'1 notice fees will be required To be paid after staff review for public notice: Most applications for Special Use Permits and Zoning Map Amendment require at least one publid hearing by the Planning Commission and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a Igal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be provided to the applicant after the fmal cost is determined and must be paid before the application is heard by a public body. MATZT. t'TTprrrc ern r'nrnvmv OP AT R'P.MART.F/PAVMF.NT AT ('OMMITNTTY T)FVFT,nPMFNT rATTN7TFR Preparing and mailing or delivering up to $fry (50) notices $200 + actual cost of first-class postage Preparing and mailing or delivering each notice after fifty (50) $1.00 for each additional notice+ actual cost offrst-elass postage ➢" Legal advertisement (published twice in the newspaper for.each public hearing) Actual cost (minimum of $280 for total of 4 publications) County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 6/7/2011 Page 1 of I