HomeMy WebLinkAboutSUB201100145 Review Comments Bond Estimate 2011-12-19Development Name Willow Glen Phase 1 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item SUB201100145 contigency 25% $37,053.26 No. Unit Unit Cost Cost Number installed Shannon Glen Court 12 +20 to 17 +94.55 road length 574.6 ft 1 aggregate base 6.0 in d 574.6 ft L 26.0 ft W 276.6 cy $43.09 $11,920.21 2 blotted or prime &double seal 574.6 ft L 0.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 3.0 in d 574.6 ft L 26.0 ft W 209.1 tons $88.20 $18,445.81 4 asphalt surface 1.5 in d 574.6 ft L 26.0 ft W 104.6 tons $98.28 $10,276.95 6 curb CG -2 1149.1 ft $10.08 $11,582.93 7 curb CG -6 1149.1 ft $16.59 $19,063.57 8 sidewalk, asphalt 0.0 in d ft L 4.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 4' width 1149.2 ft $13.99 $16,077.31 10 ramp CG -12 5 $378.00 $1,890.00 11 street name sign 1 $78.00 $78.00 12 traffic control sign 2 $59.22 $118.44 13 guardrail (or rebuild wall in right -of -w� 0 ES @ $3700 135.0 ft $20.16 $2,721.60 14 manhole or drop inlet 8 $1,638.00 $13,104.00 16 pipe, rcp (15 to 48 ") 15.0 in d 1 ES -1,2 $250 1 EC -1 $200 526.0 ft $27.72 $15,030.72 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 Street Trees 23.0 $100.00 $2,300.00 22 E &S fabric, EC -2,3 0 ft L 4 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 574.6 ft L 57.0 ft W 0.8 acre $12,600.00 $9,472.95 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $4,158.00 24 CBR tests (1 every 0.1 mi. per road) 574.6 ft L 1.149 !no of 500' 2 $189.00 $415.80 25 as -built drawings (1 k+ price per 0.1 1 574.6 ft L 0.109 mi. 2 $1,260.00 $3,520.00 26 survey and layout (price per 0.1 mi.) 574.6 ft L 0.109 mi. 2 $630.00 $2,260.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (1 lane) 574.6 ft L 0.109 mi. 2 Lanes $2,000.00 $4,352.65 29 VDOT maintenance fee (1 In rd, 1 yr) 574.6 ft L 0.109 mi. 2 Lanes $150.00 $326.45 30 VDOT admin. Cost recovery fee(1 Ian 574.6 ft L 0.109 mi. 2 Lanes $100.00 $467.63 cost sum $148,213.03 contigency 25% $37,053.26 Total $185,270 12/19/2011 Development Name Willow Glen Phase 1 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item SUB201100145 contigency 25% $16,412.70 No. Unit Unit Cost Cost Number installed Templhof Court 10 +00 to 12 +40 road length 240.0 ft 1 aggregate base 6.0 in d 240.0 ft L 47.0 ft W 208.9 cy $43.09 $9,001.02 2 blotted or prime &double seal 0.0 ft L 18.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 2.0 in d 240.0 ft L 47.0 ft W 105.3 tons $88.20 $9,285.70 4 asphalt surface 1.5 in d 240.0 ft L 47.0 ft W 79.0 tons $98.28 $7,760.19 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 480.0 ft $16.59 $7,963.20 8 sidewalk, asphalt 0.0 in d 240.0 ft L 4.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 4' width 270.0 ft $13.99 $3,777.30 10 ramp CG -12 2 $378.00 $756.00 11 street name sign 1 $78.00 $78.00 12 traffic control sign 2 $59.22 $118.44 13 guardrail (or rebuild wall in right -of -w� 0 ES @ $3700 0.0 ft $20.16 $0.00 14 manhole or drop inlet 3 $1,638.00 $4,914.00 16 pipe, rcp (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 253.0 ft $27.72 $7,013.16 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 72.0 ft $27.72 $1,995.84 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric, EC -2,3 0 ft L 4 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 240.0 ft L 58.0 ft W 0.3 acre $12,600.00 $4,026.45 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $4,158.00 24 CBR tests (1 every 0.1 mi. per road) 240.0 ft L 0.48 !no of 500' 2 $189.00 $283.50 25 as -built drawings (1 k+ price per 0.1 1 240.0 ft L 0.045 mi. 1 $1,260.00 $2,260.00 26 survey and layout (price per 0.1 mi.) 240.0 ft L 0.045 mi. 1 $630.00 $1,630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (1 lane) 240.0 ft L 0.045 mi. 0 Lanes $2,000.00 $0.00 29 VDOT maintenance fee (1 In rd, 1 yr) 240.0 ft L 0.045 mi. 0 Lanes $150.00 $0.00 30 VDOT admin. Cost recovery fee(1 Ian 240.0 ft L 0.045 mi. 0 Lanes $100.00 $0.00 cost sum $65,650.79 contigency 25% $16,412.70 Total $82,070 12/19/2011 Development Name Willow Glen Phase 1 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item SUB201100145 No. Unit Unit Cost Cost Number installed Templhof Court 12 +40 to 13 +88 road length 148.0 ft 1 aggregate base 6.0 in d 148.0 ft L 47.0 ft W 128.8 cy $43.09 $5,550.63 2 blotted or prime &double seal 0.0 ft L 18.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 2.0 in d 148.0 ft L 47.0 ft W 64.9 tons $88.20 $5,726.18 4 asphalt surface 1.5 in d 148.0 ft L 47.0 ft W 48.7 tons $98.28 $4,785.45 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 296.0 ft $16.59 $4,910.64 8 sidewalk, asphalt 0.0 in d 148.0 ft L 4.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 4' width 215.0 ft $13.99 $3,007.85 10 ramp CG -12 0 $378.00 $0.00 11 street name sign 0 $78.00 $0.00 12 traffic control sign 0 $59.22 $0.00 13 guardrail (or rebuild wall in right -of -w� 0 ES @ $3700 0.0 ft $20.16 $0.00 14 manhole or drop inlet 2 $1,638.00 $3,276.00 16 pipe, rcp (15 to 48 ") 15.0 in d 1 ES -1,2 $250 1 EC -1 $200 220.0 ft $27.72 $6,548.40 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 72.0 ft $27.72 $1,995.84 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric, EC -2,3 0 ft L 4 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 148.0 ft L 58.0 ft W 0.2 acre $12,600.00 $2,482.98 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $4,158.00 24 CBR tests (1 every 0.1 mi. per road) 148.0 ft L 0.296 !no of 500' 1 $189.00 $245.70 25 as -built drawings (1 k+ price per 0.1 1 148.0 ft L 0.028 mi. 1 $1,260.00 $2,260.00 26 survey and layout (price per 0.1 mi.) 148.0 ft L 0.028 mi. 1 $630.00 $1,630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (1 lane) 0.0 ft L 0 mi. 0 Lanes $2,000.00 $0.00 29 VDOT maintenance fee (1 In rd, 1 yr) 0.0 ft L 0 mi. 0 Lanes $150.00 $0.00 30 VDOT admin. Cost recovery fee(1 Ian 0.0 ft L 0 mi. 0 Lanes $100.00 $0.00 cost sum $47,207.66 contigency 25% $11,801.92 Total $59,010 12/19/2011