Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201100089 Review Comments Bond Estimate 2012-01-17
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Charlottesville Self Storage PROJECT NUMBER: WPO- 2011 -00089 DATE OF ESTIMATE: 01/17/12 ESTIMATE BY: PBC BASED ON: Document submitted 1/12/2012 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.7 1500 1050 SILT FENCE LF 360 5 1800 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 RISER STRUCTURE EA 1 2000 2000 OUTLET PROTECTION EA 3 200 600 EC -2 & 3 DITCH PROTECTION LF 250 10 2500 OR LEVEL SPREADER RIP -RAP LF 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 9950.00 project management 1492.50 subtotal 11442.50 CONTINGENCY LS 10% 1144.25 TOTAL 12586.75 BOND AMOUNT REQUIRED 12600.00