Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201100089 Review Comments Bond Estimate 2012-01-17 (3)
PROJECT NAME: Charlottesville Self Storage FILE M WPO- 2011 -00089 DATE APPROVED: 17- Jan -12 Item Unit Amount Unit Cost Subtotal dam const.on site material cubic yard 50 $4.00 $200.00 dam const.off site material cubic yard 0 $15.00 $0.00 Trees & Shrubs seedlings planted with tubes 0 $12.50 $0 EC -1 outlet protection each 3 $200.00 $600 class 1 rip -rap square yard 70 $55.00 $3,850 class 2 rip -rap square yard 0 $110.00 $0 48" concrete riser structure each 1 $1,000.00 $1,000 Stream Buffer Sign Installed each 0 $50.00 $0 EC -2 EC -3 ditch stabilization linear foot 0.00 $10.00 $0 maintenance road linear foot 100.00 $8.00 $800 Plastic pipe linear foot 75.00 $15.00 $1,125 EC -3, EC -2 matting square yard 0.00 $10.00 $0 gabions, class 1 rip -rap square yard 0.00 $165.00 $0 embankment improvements each 0.00 $5,000.00 $0 subtotal $7,5n project management $1,136 subtotal 8,711 10% Contingency $871 TOTAL $9,582 ROUNDED TOTAL $9,600 min total after reduction $1,920