HomeMy WebLinkAboutARB201100020 Review Comments Final Site Plan and Comps. 2012-02-09Phone (434) 296 -5832
�'IRGI1`�ZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
MEMORANDUM
Fax (434) 972 -4126
TO: Ron Lilley, Facilities Development
FROM: Margaret Maliszewski, Principal Planner
CC: John Reno, PHRA, 58 Kenmore St., Harrisonburg, VA 22801
Todd Willoughby, Grimm & Parker, 1355 Beverly Road, Suite 105, McLean VA 22101
Ellie Ray, Senior Planner
RE: ARB- 2011 -20: Crozet Library Phase 2
DATE: February 9, 2012
I have reviewed the Crozet Library Phase 2 resubmittal with drawings revised 1/30/2012 and your
2/6/2012 responses to my questions emailed on 2/3/2012.
Outstanding issues include submittal of the planting easement for the trees on the south side of the site
and the inclusion of relevant retaining /dumpster wall details in the site plan set.
The planting easement is not an EC issue alone; Ellie Ray, the lead plan reviewer for the library project,
has identified receipt of the easement document as a condition of site plan approval. As such, I will leave
the planting easement issue for Ellie to resolve.
The retaining and dumpster wall details, including the material and color information that is critical to the
EC review, are provided on various sheets of the site plan and architectural drawings. Ellie has identified
details in the architectural set that should be included in the site plan set. Meeting Ellie's condition in this
regard will be sufficient for EC purposes.
Please provide me with a copy of the revised drawings that you will submit to meet Ellie's conditions of
approval. Assuming that no unrequested changes or changes that impact the appearance of the
development from the EC are made, I anticipate issuing a Certificate of Appropriateness based on that
revised set.
If you have questions about this action, please feel free to contact me.