Loading...
HomeMy WebLinkAboutSP201100029 Review Comments Special Use Permit 2012-01-09R r, COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 -3819 Gregory A. Whirley Commissioner of Highways January 9, 2012 Mr. Bill Fritz Dept. of Planning & Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Special Use Permits and Rezoning Submittals Dear Mr. Fritz: Below are VDOT's comments for the December, 2011 Rezoning and Special Use Permit applications: SP- 2011 -00029 Verizon Wireless, Tier III PWSF (Christopher Perez) 1. This modification to an existing tower does not require a permit from VDOT since it will access through an existing driveway. SP- 2011 -00031 Greenbrier Emergency Animal Hospital (Joanne Purtsezva) 1. The estimated increase in traffic for this use is 50 to 60 VPH in the AM and PM peak hours. It is not clear whether this is an increase in traffic or just a change to a new use that will have no net effect on traffic. ZMA- 2011 - 00008, 00009 Three Notched Center (Megan Yaniglos) 1. Route 240 is functionally classified as a Rural Minor Arterial. VDOT records indicate that the road is 35 mph but it is posted at 25 mph. 2. The required spacing for a full access commercial entrance at 25 mph is 355 feet and 35 mph is 470 feet. It appears that there is enough frontage on Route 240 to meet the spacing requirements. 3. The increase in traffic from this proposed use is 166 VPH in the peak hour. A right and left turn lane analysis needs to be provided for review in accordance with Appendix F of the VDOT Road Design Manual. ZMA- 2011 -00010 Albrecht Place (Claudette Grant 1. ITE trip generation estimates that this use will generate 3400 vehicles per day on weekdays and 4700 VPH on Saturdays. 2. This site does not meet the threshold for traffic to require a Chapter 527 Traffic Impact Study. This site will generate a volume of traffic that will impact surrounding intersections on route 29 and other side roads and it is recommended that the county require some type of traffic impact analysis for this proposed use. If you have any questions, please contact me. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency