Loading...
HomeMy WebLinkAboutSDP201200008 Review Comments Final Site Plan and Comps. 2012-02-24i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Claudius Center WP0201100014 Plan preparer: Collins Engineering [fax 29328131 Owner or rep.: CROZET SQUARE LLC [fax ] Plan received date: 3 February 2012 Date of comments: 24 Feb 2012 Reviewer: Max Greene The Water Protection Plans (WP0201100014) submitted 25 January 2011 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: Road and drainage plans (SDP201200008) a. VDOT approval is required. Comments will be forwarded when received. [DM905] 2. Site plan (SDP201200008) a. Please note to the segmental retaining wall is Anchor Diamond or equivalent. The County cannot indorse a single product over another. b. The segmental retaining wall appears to exceed the 2' width as shown. According to manufactures details the wall could be as wide as 4' or more due to the proposed height and the 1" set back per 8" course. Please show the wall accurately on the plans. c. Please show a spot elevation at the bottom of the steps by the handicap parking space. d. Plan appears to require a drop inlet added to the entrance of the alley to stop the existing storm flow from entering Library Avenue. This inlet should be utilized to capture runoff from the site as well as from the alley. 3. Stormwater Management and Mitigation Plan (WP0201100014) a. The Crozet downtown Stormwater project has not been completed and the drainage system to the basin has not been installed. A Licking Hole fee will be generated upon WPO approval. 4. Erosion Control Plan (WP0201100014) a. Sediment trap is within the building footprint and does not appear to work once the building construction begins. Please add a note to the plan that states the retaining wall portion of the building, storm drain system, and positive grading to proposed inlets will be completed prior to asking the inspector for permission to remove the sediment trap. b. ESC -3 shows a (DD) symbol where a (SF) should be along the alley. c. Please submit for County files the off -site construction easement as shown on the plans. Once these comments have been addressed, please submit 3 copies of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Engineering Review Comments Page 2 of 2 Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: Documents