Loading...
HomeMy WebLinkAboutARB201200012 Review Comments Miscellaneous Submittal 2012-03-06�'IRGINLP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 March 5, 2012 Ali R. Daughtry Robertson, Loia Roof, Architects & Engineers 3460 Preston Ridge Road Suite 275 Alpharetta, GA 30005 RE: ARB- 2012 -12: Kroger Fuel Center Dear Ali, We have received the above -noted application and I have determined that it may be reviewed as a county- wide Certificate of Appropriateness for a building located behind another building. The following revisions are requested to make the proposal consistent with the design criteria that apply to the county- wide Certificate. 1. ARB Fuel Canopy Guidelines recommend a maximum height of 14'- 6" to the bottom of the fascia and a maximum fascia height of 3'. Drawings included in this proposal show a 3.5' tall canopy fascia, and your email of January 5, 2012 requested a maximum height of 16' (to bottom of fascia) due to issues with clearance, the 1 foot grade change and the canopy's lack of slope. Staff has determined the additional height for both would not be detectable from the Entrance Corridor due to the distance and structures /vegetation in between. However, contrary to your request, sheet Albemarle CO, VA Kroger Fuel Center R -334 shows a proposed 19' maximum height to the bottom of the canopy fascia and Sheet A2.0 Exterior Elevations and Signage shows a 14' — 6" minimum distance. Revise both drawings to show a maximum height of 16' to the bottom of the fascia 2. ARB Guidelines recommend that canopy fascias not be illuminated. The drawings included in this application do not address this guideline. Revise sheet Albemarle CO, VA Kroger Fuel Center R -334 to include a note indicating that the canopy fascia shall not be illuminated. 3. The location of tree protection fencing is shown on Sheet LA -1 Landscape Plan but not on the grading plan or erosion control plan. Revise the grading plan and erosion control plans to show the proposed location of tree protection fencing. The following issues relate to signage and would need to be addressed before a sign permit/application could be approved. 1. Stewart Wright, Permit Planner (434- 296 -5832 x 3024, swright2 @albemarle.org ) can advise you as to whether or not your sign proposal meets the sign ordinance requirements (max. square feet and height permitted, setbacks from property line etc). Please contact him. Note: he will require more information than you have provided in this application. 2. Canopy Wall/logo Sign • Pantone color numbers were not included on the sign drawing • Dimensions not provided for logo and the text/numbers in the gas pricing • Bulb type for gas pricing not indicated on drawing. If LED, the following note regarding intensity is required: Daytime intensity limited to 70% of maximum intensity; Nighttime intensity limited to 16% of maximum intensity with automatic dimming at dusk. • ARB Sign Guidelines require that the background of the sign pricing cabinet be opaque; notation indicating that is required on the drawing. 3. Freestanding Sign • Pantone color numbers and proposed sign /cabinet materials were not included on the sign drawing. • A drawing showing the location of the proposed sign, property lines and existing landscaping was not provided. This drawing needs to be in a large enough scale to be readable and show the sign setback. • Dimensions (length & height) for logo and text not provided on drawing. • Method of illumination, including bulb type, not indicated on drawing. ARB Sign Guidelines require that the background of the sign be opaque; notation indicating that is required on the drawing. Depending on the degree of visibility from the Entrance Corridor, it may be required that the logo be non - illuminated. If LED lighting is proposed the sign drawing must state The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon. Within 15 days of the date of this letter, please send me a letter (an email message is acceptable) indicating whether you will or will not proceed with these revisions. If you choose not to proceed with these revisions, staff will be unable to approve your application. If you choose to proceed with the revisions, please forward me one set of revised drawings together with a memo summarizing the revisions you've made and the attached resubmittal form. Your decision to make the revisions will suspend the 60- day review period associated with your original submittal. However, I expect to complete the review of your revised proposal within 2 weeks of your re- submittal. If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. Sincerely, Brent W. Nelson Planner cc: ARB File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: DATE: PROJECT NAME: ARB2012 -12 Kroger Fuel Center Submittal Type Requiring Revisions ( ) indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 1 B. Nelson Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2012 -12 1 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 B. Nelson