Loading...
HomeMy WebLinkAboutSP201200004 Review Comments Special Use Permit 2012-04-02; QO x COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 April 2, 2012 Ms. Kimberly Moore 297 Rudolph Street Ruckersville, VA 22968 RE: SP201200004 /Community Christian Academy Dear Ms. Moore: Staff has reviewed your initial submittal for a special use permit to allow a private school in Alliance Bible Church of Charlottesville located at 1410 Old Brook Road. We have a few comments and questions which are listed below: Plannine Initial comments on how your proposal generally relates to the Comprehensive Plan are provided below. Comments on conformity with the Comprehensive Plan are provided to the Planning Commission and Board of Supervisors as part of the staff report. The Comprehensive Plan Land Use Plan designates this property as Neighborhood Density Residential.. The existing building is a church that once had Merridale Preschool located in it. The property is located in the Development Areas and is surrounded by office uses, apartment complexes, and single family residential uses. Other schools in the vicinity include the Charlottesville Catholic School and CATEC. The proposed school will use the existing building and facilities. There are no proposed changes to the building or site. The private schools and places of worship are intended to be appropriate uses within the Neighborhood Density Residential designated areas. Neighborhood Model It is our understanding that you are not proposing any physical changes to the existing building or site. The Neighborhood Model analysis was not completed for this project since this is an existing building and site changes are not proposed. Zoning The following comments related to Zoning issues have been provided by Francis MacCall: Page 1 of 4 Revised 4 -25 -11 eke • The application states up to 100 students but does not,state ultimate staffing numbers. Please provide both staff and student numbers and use those number to provide a parking analysis stating how many parking spaces you believe you will need for the ultimate number of students and staff, including any school events. • The site does not appear to be in compliance with the approved site plan with regards to landscaping on the property. It is recommended that a condition be created that requires the site to be in compliance with the landscaping shown on the site plan approved in 1987. • Using the site plan from 1987 is fine for the concept plan, but anew title should be created so that the condition regarding the site to being in general accord with the concept plan is clear. • Standard conditions of approval, as applicable, are recommended. Engineering and Water Resources The following comments related to engineering and water resources have been provided by Glenn Brooks: It is recommended that traffic impacts be assessed at the entrance on the public road. Building Inspections The following comments related to building inspections have been provided by Jay Schlothauer: The following condition needs to be included: All students must be over the age of 2 % years. Fire - Rescue The following comments related to Fire - Rescue issues have been provided by Robbie Gilmer: • A Fire Inspection by the Fire Marshal Office prior to opening of the school will be needed. • VSFPC 404.2 Where required. An approved fire safety and evacuation plan shall be prepared and maintained for the following occupancies and buildings: 1. Group A, other than Group A occupancies used exclusively for purposes of religious worship that have an occupant load less than 2,000. 2. Group B buildings having an occupant load of 500 or more persons or more than 100 persons above or below the lowest level of exit discharge. 3. Group E. VSFPC 405.2 Fire Drills must be performed on a monthly basis in Group E occupancy's and they should include all occupants. VSFPC 405.5 Record keeping. Records shall be maintained of required emergency evacuation drills and include the following information: 1. Identity of the person conducting the drill. 2. Date and time of the drill. 3. Notification method used. 4. Staff members on duty and participating. 5. Number of occupants evacuated. 6. Special conditions simulated. 7. Problems encountered. 8. Weather conditions when occupants were evacuated. 9. Time required to accomplish complete evacuation. Page 2 of 4 Revised 4 -25 -11 eke ACSA The following comments related to Albemarle County Service Authority (ACSA) have been provided by Alexander Morrison: • Overall fixture count is required for review by ACSA to verify water meter size. VDOT The following comments related to traffic and transportation issues have been provided by Joel DeNunzio: • The existing entrance on Old Brook has good sight distance and adequate geometry for a commercial entrance. • The traffic generated by the private school is 93 vph in the AM peak hour, 51 peak hour trips are entering the site. • It appears that most trips entering the site will be coming from Rio Road. According to the VDOT traffic count for Old Brook Road and the left turn lane warrants in the VDOT Road Design Manual, if 43 vehicles enter the site from Rio Road in the peak hour, the entrance will warrant a left turn lane. • Because of the close proximity of the entrance to the intersection of Rio Road, the application should include an analysis of the site entrance to ensure that this will not cause queuing that may cause safety problems on Old Brook Road or Rio Road. Action after Receipt of Comments After you have read this letter, please take one of the actions identified on "Action After Receipt of Comment Letter" which is attached. Resubmittal If you choose to resubmit, please use the attached form. There is no fee for the first resubmittal. The resubmittal date schedule is provided for your convenience. Notification and Advertisement Fees Recently, the Board of Supervisors amended the zoning ordinance to require that applicants pay for the notification costs for public hearings. Prior to scheduling a public hearing with the Planning Commission, payment of the following fees. is needed: $159.90 Cost for newspaper advertisement $207.99 Cost for notification of adjoining owners (minimum $200 + actual postage /$1 per owner after 50 adjoining owners) $367.89 Total amount due prior to Planning Commission public hearing Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing needed. $159.90 Additional amount due prior to Board of Supervisors public hearing Page 3 of 4 Revised 4 -25 -11 eke $527.79 Total amount for all notifications Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Feel free to contact me if you wish to meet or need additional information. My email address is cgrant @albemarle.org Sincerely, Claudette Grant Senior Planner, Community Development enc: Action After Receipt of Comments Resubmittal Schedule Resubmittal Form Page 4 of 4 Revised 4 -25 -11 eke DEPARTMENT OF COMMUNITY DEVELOPMENT U �G� �'jRGIN1P ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the last page of your comment letter with your submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter, you need to request an indefinite deferral. Please provide a written request and state your justification for requesting the deferral. (Indefinite deferral means that you intend to resubmit /request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. After outstanding issues have been resolved and /or when you are ready to request a public hearing, staff will set your public hearing date for the Planning Commission in accordance with Page 1 of 6 Revised 4 -25 -11 eke the Planning Commission's published schedule and as mutually agreed by you and the County. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date. By no later than twenty -one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment letter will contain the actual fees you need to pay. Payment for an additional newspaper advertisement is also required twenty -two (22) days prior to the Board of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Public Hearings form. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will. be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is made within 10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees may be paid in cash or by check and must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. Page 2 of 6 Revised 4 -25 -11 eke FEE SCHEDULE FOR ZONING APPLICATIONS A. Fora special use permit: 1. Additional lots under section 10.5.2.1; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 2. Public utilities; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 3. -Day care center; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Eachadditional resubmittal ....................................... ............................... ........................$500.00 4. Home occupation Class B; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal .......................... ............................... ...... ............................... $ 500.00 5. 5. Amend existing special use permit; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 6. Extend existing special use permit; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 ........................................... ............................... 500.00 Each additional resubmittal .................... $ 7. All other special use permits; application and first resubmission Fee............................................................................ ............................... ......................$2,000.00 Each additional resubmittal ........................................................... ............................... $1,000.00 8. Deferral of scheduled public hearing at applicant's request Fee............................................................................. ............................... ........................$180.00 B. For amendment to text of zoning ordinance: Fee................................................................................... ............................... .......................$1000.00 C. Amendment to the zoning map: 1. Less than 50 acres; application and first resubmission Fee............................................................................ ............................... ......................$2,500.00 2. Less than 50 acres; each additional resubmission Fee............................................................................ ............................... ......................$1,250.00 3. 50 acres or greater; application and first resubmission Fee..................................................................:......... ............................... ......................$3,500.00 4. 50 acres or greater; each additional resubmission Fee............................................................................ ............................... ......................$1,750.00 5. Deferral of scheduled public hearing at applicant's request Fee.............................................................................. .........,.............a....... ........................$180.00 D. Board of Zoning Appeals: 1. Request for a variance or sign special use permit Fee............................................................................. ............................... ........................$500.00 2. For other appeals to the board of zoning appeals (including appeals of zoning administrator's decision) — Fee (to be refunded if the decision of the zoning administrator is overturned) .......$240.00 N. Required notice: 1. Preparing and mailing or delivering up to fifty (50) notices: Fee............................................................................. ............................... ........................$200.00 plus the actual cost of first class postage 2. Preparing and mailing or delivering, per notice more than fifty (50): Fee............................................................................... ............................... ..........................$1.00 plus the actual cost of first class postage 3. Published notice: Fee................................................................:.............. ............................... ........................Actual cost Page 3 of 6 Revised 4 -25 -11 eke 2012 Submittal and Review Schedule Special Use Permits and Zoning Map Amendments Resubmittal Schedule Written Comments and Earliest Planning Commission Public Hearing* Resubmittal Dates Comments to applicant for decision on whether to proceed to Public Hearing Legal Ad Deadline and Decision for Public Hearing ** Planning Commission Public Hearing No sooner than* Monday Wednesday Monday Tuesda Dec 19 2011 Jan 18 Feb 6 Feb 28 Tue Jan 3 Feb 1 Feb 13 Mar 6 Tue Jan 17 Feb 15 Feb 27 Mar 20 Feb 6 Mar 7 Mar 12 Apr 3 Tue Feb 21 Mar 21 Apr 2 Apr 24 Mar 5 Apr 4 Apr 16 May 8 Mar 19 Apr 18 Apr 30 May 22 Apr 2 May 2 May 14 Jun 5 Apr 16 May 16 May 28 Jun 19 May 7 Jun 6 Jun 25 Jul 17 May 21 Jun 20 Jul 9 Jul 31 Jun 4 Thu Jul 5 Jul 16 Aug 7 Jun 18 Jul 18 Jul 30 Aug 21 Jul 2 Aug 1 Aug 20 Sep 11 Jul 16 Aug 15 Tue Sep 4 Sep 25 Aug 6 Sep 5 Sep 17 Oct 9 Aug 20 Sep 19 Oct 1 Oct 23 Tue Sep 4 Oct 3 Oct 15 Nov 6 Sep 17 Oct 17 Oct 22 Nov 13 Oct 1 Oct 31 Nov 12 Dec 4 Oct 15 Nov 14 Nov 26 Dec 18 Nov 5 Dec 5 Dec 17 Jan 82013 Nov 19 Dec 19 Jan 7 2013 Jan 29 2013 Dec 3 Jan 2 2013 Jan 14 2013 Feb 5 2013 Dec 17 Jan 16 2013 Feb 4 2013 Feb 26 2013 Dates shown in italics are changes due to a County holiday * The reviewing planner will. contact applicant to discuss comments of reviewers and advise that changes that are needed are significant enough to warrant an additional submittal or advise that the the project is ready for a public hearing. If changes needed are minor, the planner will advise that the project go to public hearing. ** The lanai ad rlaarlline is the last elate at which an annlicant can decirio lnthothor to roci iihmit nr nn -u- r�...,_... __.. ___..... ....,...�_. . I- Li o � N -n L o co � O � cn O a U a- .r n' Lo }y C D Lo DO 3 CD N a n UM re!, O Q O rn r_ O V/1 O cn "D a O� O w Z m "O co O_ CO � IJ O 1 >v `G c� CD v CD v O O -- C\D OD = '�I W Ch -\A = W IQ N y : L 1Z IV -> IV CD IV w - _4 \ IJ N IV \ Y \� :y IN fT I` IV m J t'� O \ O \ CO C`I ` O CD N � m (D IV IV N N N N tJ IJ IV IJ N IJ IV IJ N IV IV N IJ IV 1\-) N IV '3• r O N N M '�I O O W O) co co -i -• I� O O (D \ N \ \ W \ \ (D \ O \ N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ '� .1 csa IV IJ N N N IQ N N N N N- -L N N N N N N N N N N N n ,Z CD O O CO QD W -J U'I .tom W N I` IV N N -� N \ N \ J \ (P \ \ N IV m C� \ O \ CD \ IQ \ co \ \ O \ \I \ m \ W \ m \ IV \ -P \ -� \ `I \ W \ CO \ Cfl \ Cn \ O \ W \ W Q0 'W. IV IV IV N N IV IQ IV IQ IJ IV fJ 1 IQ 1 N 1 IQ IQ IV 1 IQ IV IQ IQ IV N IV CL -Q 11 Cn m Ul Cn IJ N r -� -� O O O (D OD OD \ \ \ \ y m \ IJ \ - \ IJ \ N N \ \ IV IV IV - N N IV IV y N -� IV N IJ IV ca W O (D IQ .1-- 'J \I O W O Cn Cb OD W Cn 0) O -1 O W m W CO m D N tJ IJ N N IV IQ IJ IJ IQ IV -�. y D. IJ N tJ IQ IV IQ IJ IJ N IJ IV 1 r 1 IV -� - 1 O O I>7 O Cil ()I A p W W N N N � I j � IV � � � � � W N � -' N -' C\iJ i N -\�• N N W � � O \ O \ M \ O \ Ln \ - \ \I \ W \ W \ O \ W \ O \ \ OD \ .tom \ O \ 0 \ W \ N \ �I \ 0 \ 0 \ M \ N \ m N N N N N N N IV N N N N N N N N [\)I N I tV N I N IV I IV I N D r., 1 1 _ 1 _ O CD C7j 1 A 07 U"I y .L> W IJ j hJ 0 ,� \� irn� W N iJ O 10 YJ \ IQ w N � IQ \ N Iv IJ U.W IJ \ iv W t= W = O W I1 CT != OD G ` IJ a7I (r �I O W N f� K CD N N N N O N lD lD W \ J J m Ln .P W N I A F- \ N \ N \ O \ \ \ (x) \ \ \ Q1 \ Ln \ 1] \ W \ N \ \ N \ N \ N \ N \ N N W 00 h W m W LO Cn N N �1 N �I CD Ln N m .A W O cn Do J . O IN I\ N N N N N N N C) N N IJ N N N N N N N N _IQ N N J N N N N N N N N N N AI Li o � N -n L o co � O � cn O a U a- .r n' Lo }y C D Lo DO 3 CD N a n UM re!, O Q O rn r_ O V/1 O cn "D a O� O w Z m "O co O_ CO � IJ O 1 'C1 `G CD rP v CD IN IZ 3 1 O O CD O ICJ co W W Cn Cn .A W W N N N CD O N N M '�I O O W O) co co -i -• I� O O (D \ N \ \ W \ \ (D \ O \ N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ '� .1 IV IJ N N N IQ N N N N N- -L N N N N N N N N N N N F CD m CL -Q 11 Cn m Ul Cn IJ N -� -� O O O (D OD OD \ \ \ \ y ` \ IJ \ - \ IJ \ N N \ \ IV IV IV - N N IV IV y N -� IV N IJ IV W O (D IQ .1-- 'J \I O W O Cn Cb OD W Cn 0) O -1 O W m W CO s N tJ IJ N N IV IQ IJ IJ IQ IV -�. y IJ N tJ IQ IV IQ IJ IJ N IJ IV r CD m D r., 1 1 _ 1 _ O CD C7j 1 A 07 U"I y .L> W IJ j hJ ,� \� irn� W N iJ 10 YJ \ IQ w N � IQ \ N Iv IJ U.W IJ \ 3 W t= W = O W I1 CT != OD G ` IJ a7I (r �I O W N f� \ 1 \ \ \ \ \ \ I I _ IJ N IJ N IJ N N N N IV N IJ IQ N IJ I•J IQ IQ IQ IQ IQ IV IQ 1 W C) AI I' j IJ F= F-� G N l D \ \ V n' \ CTS lIi 11't \ , � W \ W IJ 1•J N CD \ hJ \ ~ \ O � (� t>7 � O W N Ui M W (T I.D hJ a N U, Z ,1 Li o � N -n L o co � O � cn O a U a- .r n' Lo }y C D Lo DO 3 CD N a n UM re!, O Q O rn r_ O V/1 O cn "D a O� O w Z m "O co O_ CO � IJ O 1 FOR OFFICE USE ONLY SP 4 or ZMA # Fee Amount $ Date Paid By who? Receipt # Ck# By: Resubmittal of information for Special Use Permit or�1'�y - J�?.., A7h . . Zoning Map Amendment t„�,N,t. ,•PROJECT NUMBER: , P aO I.-.� O d CO LJ PROJECT NAME: G&CnrntA,,n -I2:1 Nl ri.0 `mot LaAer�i yl ❑ Resubmittal Fee is Required ❑ Per Request [Resubmittal Fee is Not Required 0,fa14de4fV_ (q;l;ral-r& Community Development Project Coordinator (�R 112- Signature ate 1`M Lc�Ll 0746 c— Name of App ant Phone Number Signature FEES Date Resubmittal fees for Special Use Permit -- original Special Use Permit fee of $1,000 ❑ First resubmission FREE ❑ Each additional resubmission $500 .a Ltk.}. - <1*-r� ii�*t.?.•:,hr,,,� ��•k' :;rz .:y:�:? -. ";# .�Y..,..`�St'1 ZsG^� e 'itq'a SNnsY� -,v... - � .`�,3•,aa" tY Xp} 4 �$u l' ����..��}.•.j$XiiS��Xi�kK'S` - Th�SZ1`� 'Y` Y Y�� •F �i'aa *.a%YS�Y', � �.i.�. r. �...�.�"�i �.r.S �: .iFVY, ,.Y'y 3�TL /<4 Lr. �F. iS ��vg$ ��3i SY. �r�. Ap''�^ gg3 .5 `v ��,,>> �;"i'"Y{ �M1.� 5 �, i3 Resubmittal fees for original Special Use Permit fee of $2,000 9--first resubmission FREE ❑ Each additional resubmission $1,000 iii .•.< } ✓.': .:.4 N1'.:1 �.��. .�+� Resubmittal fees for original Zoning Map Amendment fee of $2,500 ❑ First resubmission FREE ❑ Each additional resubmission $1,250 -.:r 4PV <<rXj@ '<%.. ia.>•"'x •43.t. - t,�n.!p i .k'. RY. £ 3 ! i S $y t 1 a'2. 5•� RY. 6. \ d� 4Y3.xt,Alzxu "'>.. '. ;> vA� t'YY .,L �`. 4'. 1 'YYS J }4s1.>. . ".a}yx 4�. YG - x {?., .,. .. .. .. ,,.... '?" .�:.:.... '��+_.- ..<�.e_. "k4.... •.-� s_.. f�.. r }'�.:1Y., .:t.M.. .: %,..� :< .ft_,., ..4.. >.. ?•,°r ... ..,.� r?t,�•;�.� n Y'T "3.Yi.�� Resubmittal fees for original Zoning Map Amendment fee of $3,500 ❑ First resubmission FREE ❑ Each additional resubmission $1,750 S ❑ Deferral of scheduled public hearing at applicant's request —Add'1 notice fees will be required $180 To be paid after staff review for public notice: Most applications for Special Use Permits and Zoning Map Amendment require at least one public hearing by the Planning Commission and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a legal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body. MAKE CHECKS TO COUNTY OF ALBEMARLE/PAYMENT AT COMMUNITY DEVELOPMENT COUNTER i Preparing and mailing or delivering up to fifty (50) notices $200 + actual cost of first -class postage i> Preparing and mailing or delivering each notice after fifty (50) $1.00 for each additional notice+ actual cost of first -class postage A Legal advertisement (published twice in the newspaper for each public hearing) Actual cost (minimum of $280 for total of 4 publications) County of Albemarle Department of Community Development. 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 6/7/2011 Pase 1 of 1