HomeMy WebLinkAboutSDP201200014 Review Comments Final Site Plan and Comps. 2012-03-27`J I1 pJ11 �11'] �J, r, �) ifilly
Service Authority
TO: Ellie Ray
FROM: Alexander J. Morrison, Civil Engineer
DATE: March 27, 2012
RE: Site Plan Technical Review for: SDP201200014:
(Phase 1) — Final
TMP# 46134 -7A
The below checked items apply to
this site.
Timberwood Square at Forest Lakes
✓ 1. This site plan is within the Authority's jurisdictional area for:
✓
A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓
2.
A 6 inch water line is located approximately (ON PROPERTY) distant.
3.
Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓
4.
An 18 inch sewer line is located approximately 150' distant.
5.
An Industrial Waste Ordinance survey form must be completed.
✓
6.
No improvements or obstructions shall be placed within existing or future
easements.
7.
and plans are currently under review.
8.
and plans have been received and approved.
9.
No plans are required.
✓
10.
Final water and sewer plans are required for our review and approval prior to
granting tentative approval.
11.
Final site plan may /may not be signed.
12.
RWSA approval for water and /or sewer connections.
13.
City of Charlottesville approval for sewer.
✓
Comments:
• It appears the existing waterline will require dedication. ACSA will advise the developer as
to what is required.
• FINAL CONSTRUCTION plans are required. Please submit 3 sets of plans to the ACSA
along with a water data sheet.
• Fixture counts are required so that the ACSA can size the water meter.
• A blown up view and detail of the waterline work is required on the plans.