Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201100069 Review Comments Bond Estimate 2012-03-14
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Route 29 12 -inch Water Main Abandonment at Hollymead Town Center PROJECT NUMBER: WPO- 2011 -00069 DATE OF ESTIMATE: 03/14/12 ESTIMATE BY: PBC BASED ON: Plan received 14 November 2011 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.42 1500 630 SILT FENCE LF 925 5 4625 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 1 200 200 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 2 2000 4000 subtotal 9455.00 project management 1418.25 subtotal 10873.25 CONTINGENCY LS 10% 1087.33 TOTAL 11960.58 BOND AMOUNT REQUIRED 12000.00