HomeMy WebLinkAboutSUB201200010 Review Comments Final Plat 2012-04-03ALg�,��
�'IRGINZ�
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Old Trail Creekside Phase II of Phase III Final Plat; SUB - 2012 -00010
Plan preparer:
Mr. Michael Jenkins, LS; Jenning Stephenson P.C.
Owner or rep.:
Mr. Jackie Shifflett
Date received:
17 January 2012
(Rev. 1) 13 March 2012
Date of Comment:
15 February 2012
(Rev. 2) 3 April 2012
Lead Engineer:
Phil Custer
The first revision to the final plat for the Old Trail Creekside Phase III Phase II, received 13 March 2012,
has been reviewed. Engineering will have no objection to the approval of this plat after the following
comments have been addressed.
1. This plat cannot be approved until the WPO and Subdivisions bonds have been posted. To request
a bond estimate, please submit a completed Bond Estimate Request Form to the county engineer
after all of the construction plans have received approval. The computation of the subdivision
bond will not be performed until a $250 fee is paid to the county. Before a subdivision bond can
be posted, the county engineer must approve the applicant's Schedule of Completion. At the time
of this letter, the construction plans have not been approved. Because of this, additional comments
may be provided during later reviews of this plat.
(Rev. 1) Comment has been acknowledged by the applicant.
2. The county's private street note ( #16) is shown on the cover sheet. These roads must be public,
unless previously authorized. Please remove this note or provide proof of private street
authorization. The following five comments assume these roads must be public.
(Rev. 1) Comment has been addressed.
3. All roads must be labeled "Hereby Dedicated to Public Use." [14- 302.A.5]
(Rev. 1) Comment has been addressed.
4. All drainage easements designations, except the one between lots 36 and 37, must include "Hereby
Dedicated to Public Use." (The private drainage easement will likely need a private maintenance
agreement.) [14- 302.A.5,14 -317]
(Rev. 1) Comment has been addressed.
5. Public drainage easements are needed on the north side of Three Board Lane and encompassing
pipe 83's outlet. [14- 303.L]
(Rev. 1) The scope of this plat has been revised exclude the Three Board Lane.
6. Deeds of Easement for the public drainage easements must be approved by the County Attorney's
Office and recorded with this plat.
(Rev. 1) County staff did notfind any deed document for the proposed public drainage
easements with the plat resubmittal.
7. Public sidewalk easements appear to be necessary on both sides of all roads. [14- 303.E, 14- 303.L]
(Rev. 1) Comment has not been addressed. Please see public street plan comments. Sidewalks,
M
10
and their easements, are needed on both sides of the street unless a waiver was granted by the
Planning Commission.
Please provide bearings on all drainage easements. [14- 303.E, 14- 303.L] Some of the drainage
easement lines are missing a dimension as well.
(Rev. 1) Comment has been addressed.
Sight distance easements may be required, depending on the review of the road plan. [14- 303.E,
14- 303.L]
(Rev. 1) The scope of this plat has been revised exclude the needed sight distance easements for
Windmere Lane. However, the sidewalk easement on the inside of the curve on Wellbourne is
also needed to provide the required 155ft stopping sight distance. Please label this easement as
a sight distance easement as well.
After reviewing planning comments, it seems that the common area will be dedicated to the county
because of the bonus density computed with the preliminary plat. Within the common area to be
dedicated is a stormwater facility whose maintenance responsibilities I recommend the county not
accept. The applicant should work with the County Attorney's office regarding maintaining the
right of the HOA to access the facility for maintenance after it's dedicated to the county. Since this
will be an active construction area many months after plan approval, the applicant should also
work out language so that they can maintain the sediment basin and every other part of the
property within the limits of disturbance after it has been dedicated to the county.
(Rev. 1) Comment has been acknowledged by the applicant.