Loading...
HomeMy WebLinkAboutSUB201200028 Review Comments Final Plat 2012-03-21 (3)`J I1 pJ11 �11'] �J, r, �) ifilly Service Authority TO: Ellie Ray Carter FROM: Alexander J. Morrison, EIT, Civil Engineer DATE: March 21, 2012 RE: Site Plan Technical Review for: SUB - 2012 -00028 : Whittington Subdivision - Phase A Final Subdivision Plat TMP # 90 -3 TMP # 90 -45 TMP # 90 -46 The below checked items apply to this TMP # 90 -47 site. TMP # 90 -48 TMP # 89 -95 ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A 12 inch water line is located on parcel. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 8 inch sewer line is located approximately 30'distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: • Note on Cover: Water and Sewer Easements to be centered on as -built locations. • Add easement to waterline along future road (interconnect with existing line). • Change Sewer Easement Notes: 20' Sanitary Sewer Easement Hereby Dedicated to ACSA. • Call out each water meter easement. You can call "Water Easement (Typ.)" and note that this means "Water Easement Hereby Dedicated to ACSA." 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org Pj1J �]J'] �1 � J �) filly Service Authority The Albemarle County Service Authority (ACSA) has no technical comments on the SUB being reviewed. Engineering comments are usually reserved for the site plan review stage. Subdivision plats should correctly show ownership of properties and existing easements. Recordation of new easements should occur before dedication to and acceptance by the ACSA. The ACSA can review the proposed subdivision plat and determine if it is included in the jurisdictional area for water and /or sewer service. Water and /or sewer connections to the ACSA system are allotted on a first come, first served basis at the time connection fees are paid. The ACSA does not reserve capacity in its system for a specific project. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org