County of Albemarle
�O Department of Community Development
Memorandum
Ana Kilmer, Management Analyst
Greg Harper, Water Resources Manager
From:
Mark Hopkins
Division:
Inspections — E&S Control
Date:
23January 2014
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond may be released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: Westhall Phase 5
TMP: 056HO-00-00-00A00
SITE PLAN NUMBER: 2010-00062
FACILITY DESCRIPTION
Type(s) and number of BMPs
(incl. non-structural)
1— extended detention
1— wet pond
Description of Outfall
(Ex: 24" RCP from 36" CMP riser) -
To existing drainage swale
Water Quality
®
Yes
❑
No
Design Storm
®
l0yr
❑
2yr
Any Additional Information
(incl. stream buffer mitigation)
1 Detention Basin drains to
1 existing / upgraded pond
A copy of the_site plan and details of the BMP(s) are attached.
---
1ADEI'Mommunity Development\FomisUnspecdons\SWM Bond Release Fomi - conversion to pernianent swm facility REVISED 3 8 2010.doc
—__
a
STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE
PROJECT NAME: [re °'l/ / /Uuje -�—
PLAN/PERMIT NO. 2-.. /0 _p" L-
DATE: 2-
This project has been satisfactorily completed and the stormwater management performance bond may
be released at this time if all erosion control inspection fees invoiced have been paid.
Erosion Control Inspector
Accounting Department
All erosion control inspection fees invoiced on the above project have been collected.
Chief Accountant
Date