Loading...
HomeMy WebLinkAboutWPO201000062 Bond Release Stormwater Management Plan 2014-01-23t oFA '��� Y�RGINIP 4 4� County of Albemarle �O Department of Community Development Memorandum Ana Kilmer, Management Analyst Greg Harper, Water Resources Manager From: Mark Hopkins Division: Inspections — E&S Control Date: 23January 2014 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Westhall Phase 5 TMP: 056HO-00-00-00A00 SITE PLAN NUMBER: 2010-00062 FACILITY DESCRIPTION Type(s) and number of BMPs (incl. non-structural) 1— extended detention 1— wet pond Description of Outfall (Ex: 24" RCP from 36" CMP riser) - To existing drainage swale Water Quality ® Yes ❑ No Design Storm ® l0yr ❑ 2yr Any Additional Information (incl. stream buffer mitigation) 1 Detention Basin drains to 1 existing / upgraded pond A copy of the_site plan and details of the BMP(s) are attached. --- 1ADEI'Mommunity Development\FomisUnspecdons\SWM Bond Release Fomi - conversion to pernianent swm facility REVISED 3 8 2010.doc —__ a STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: [re °'l/ / /Uuje -�— PLAN/PERMIT NO. 2-.. /0 _p" L- DATE: 2- This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. Erosion Control Inspector Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer 1ADEPT1Communily DevelopmentlFonnslinspecllonslSTORMWATER PERFORMANCE BOND RELEASE REVISED 3 8 2010.doc