Loading...
HomeMy WebLinkAboutSDP201200014 Review Comments Final Site Plan and Comps. 2012-03-28i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Forest Lakes Office and Townhomes SDP201100042 Timberwood Square at Forest Lakes (Phase 1) SDP201200014 Plan preparer: Brian P. Smith [fax 434 - 296 -2041] Owner or rep.: Highlife LLC C/O Downer Realty [fax unknown] Plan received date: 14 June 2011 2 March 2012 Date of comments: 29 June 2011 20 March 2012 27 March 2012 Reviewer: Max Greene Michael Koslow Review Coordinator: Ellie Ray The first final site development plan and comps (SDP20 1 1 00042) (SDP201200014) submitted 2 March 2012 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Please note amended comments associated with this letter in bold and italics. Please adequately address the following comments for final approval: I ) Plan sheet has 2 slightly different titles and need to be corrected to just one for filing, bonding and general records management. Comment has been addressed. 2) All topography should beat least visually field verified by the designer within the last year. [18- 32.6.6, 14 -3021 Comment has been addressed. 3) Sidewalks abutting parking will be 6' wide (exclusive of curb) or bumper blocks will be shown /provided. Please see detail in design manual. Comment has been addressed. 4) Please show Stormwater Profiles and computations for final approval. (Rev I) Comment has been addressed by table on sheet C2.0. However, applicant will also be required to show profiles or a selected existing storm table to demonstrate MS -19 on WPO submittal. (Rev] A]) Comment has been addressed. Per applicant correspondence 312712012, this project will disturb approximately 6,000 sft. Future phases of development are not currently anticipated and will not be considered at this time. The County will inspect the site to verify the limits of disturbance during construction. If independent disturbed area calculations conclude that this project is disturbing over 10,000 sft, construction could be delayed while an approved Erosion & Sediment Control Plan is developed. Should future phases of development be accelerated within this parcel or adjacent parcels with the same owner, the limits of disturbance associated with the future phase and Phase I construction will be considered together and must be protected and treated (phased Engineering Review Comments Page 2 of 2 development [A.C. 17 -201 C]). Accelerated development shall be defined as any land disturbance proposed for construction prior to the final acceptance of this phase and prior to the release of the stormwater management bond for this phase. Please submit a Water Protection Ordinance application and fee of $300 for review of the proposed Filterra water treatment measure included with this development to treat runoff. This measure will require a stormwater management agreement and bond. 6) (Rev 1) Please provide a VDOT curb ramp designation or equivalent for proposed curb ramp (appears to be CG -12). 7) (Rev 1) Please locate existing water and sewer leads to existing medical office building at 1800 Timberwood Blvd. as this could need to be served by an easement to maintain service after proposed building construction begins. Stormwater Management and Mitigation Plan 1) Stormwater detention appears addressed by the existing pond system; however, stormwater quality is not. Please show how the Stormwater quality will be addressed for both the commercial and residential portions of site plan. Comment has been addressed. 2) WPO application, fee and plans are required for final approval. (Reel) Co,,,,, — —mains. (Rev] AI) Comment has been addressed through applicant correspondence (see Comment 4 above). Erosion Control Plan (WPO200500007) 1) WPO application, fee and plans are required for final approval. (Revl) Comme"r'PYYQ "'O (Rev] Al) Comment has been addressed through applicant correspondence (see Comment 4 above). Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow @albemarle.ora to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B).