Loading...
HomeMy WebLinkAboutWPO201100050 Review Comments Bond Inspection 2012-03-29BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Cedar Bluff - Panorama Farms PROJECT NUMBER: WPO201100050 DATE OF ESTIMATE: 08/05/11 ESTIMATE BY: MRG BASED ON: Approved plan. WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1 1500 1500 SILT FENCE LF 2000 5 10000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 CONSTRUCTION ROAD STABILIZATIi LF 2000 3 6000 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 19500.00 project management 2925.00 subtotal 22425.00 CONTINGENCY LS 10% 2242.50 TOTAL 24667.50 BOND AMOUNT REQUIRED 24700.00