Hello George,
Joanne Tu Purtsezova
Wednesday, April 25, 2012 1:
'George Ray'
'Alan Franklin'
FW: SDP - 2011 -00028 LOR #1
26 PM
to Willow Glenn
now have comments from VDOT on the LOR. As I mentioned to Alan this morning, I will be
supplying a compiled review comments package for Willow Glen when I provide Willow Glen BLA
review comments, which will include updated LOR comments, as applicable.
Joanne
From: DeNunzio, Joel D., P.E. (VDOT) [mailto: Joel .DeNunzioCcoVDOT.virginia.gov]
Sent: Wednesday, April 25, 2012 12:04 PM
To: Joanne Tu Purtsezova
Subject: SDP - 2011 -00028 LOR #1 to Willow Glenn
SDP- 2011 -00028 LOR #1 to Willow Glenn
Joanne,
I have reviewed the referenced plan and have the following comments:
Albemarle County Engineer General Construction Notes:
1. # 7 needs to refer the Manual of Uniform Traffic Control Devices, 2009 edition and the Virginia Work
Area Protection Manual, 2011.
2. Note #9 needs to refer to the Manual of Uniform Traffic Control Devices, 2009 edition.
3. Note #11 needs to remove the requirement to post speeds at 5 mph below design. Roads designed at 25
mph are posted the same.
Standards and Specifications:
1. #1 is VDOT Road and Bridge Specifications 2007
2. #2 is VDOT Road and Bridge Standards 2008
3. #5 is the MUTCD, 2009 edition and the Virginia Work Area Protection Manual, 2011
Add VDOT Inspection notes:
1. Mandatory inspections at the following phases are required for roads that are proposed to be state
maintained:
a. Installation of any enclosed drainage system before it is covered
b. Installation of any enclosed utility placements within the right -of -way before being covered
C. Construction of the cuts and fills, including field density tests, before placement of roadbed base materials
d. A final pavement design, based on actual soil characteristics and certified tests, shall be completed and approved before the
pavement structure is placed
e. Placement of base materials, including stone depths, consistent with the approved pavement design, prior to placement of the
paving course or courses, followed by field density and moisture tests and the placement of a paving course as soon as possible
Construction of pavement, including depth and density, upon completion as part of the final inspection.
g. The contractor is responsible for contacting VDOT a minimum of one week prior to each of the above phases of construction to
schedule an inspection.
h. Failure of the contractor to schedule these inspections will require additional testing of the roads at the discretion of VDOT or
may lead to the roads not being eligible for state maintenance.
Please let me know if you have any questions.
Thanks
Joel
Joel DeNunzio, P.E.
VDOT Culpeper
Land Development
434 - 589 -5871