Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201100027 Review Comments Bond Estimate 2012-04-12
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Buckingham Circle Water Project PROJECT NUMBER: WPO201100027 DATE OF ESTIMATE: 04/11/12 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.5 1500 750 SILT FENCE LF 1000 5 5000 SAFETY FENCE LF 5 3 15 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 14 500 7000 INLET PROTECTION EA 1 200 200 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 14965.00 project management 2244.75 subtotal 17209.75 CONTINGENCY LS 10% 1720.98 TOTAL 18930.73 BOND AMOUNT REQUIRED 19000.00