HomeMy WebLinkAboutSDP201200022 Review Comments Preliminary Site Plan 2012-04-27*—&A
County of Albemarle
Department of Community Development
Memorandum
From: Max Greene, Current Development engineering review
Date: 27 April 2012
Subject: Albemarle Health and Rehabilitation Center (SDP201200022) Preliminary Site Plan
The preliminary site plan has been reviewed.
1. Please show benchmark location, elevation and datum for topography. An existing utility
or other known position will suffice. [Policy]
2. Please label the loading area.
3. Please show the "Stacking Block Retaining Wall" per design specification. Appears the
wall will have a footprint of up to 4 feet wide.
4. safety railing shown for retaining walls over 4' high (building permit may be more strict)
[Policy]
5. Please label the 5' handicap aisle width on the plan sheet.
6. Roads and access ways will need to be crowned per VDOT standards of 1/a " per 1' for
adequate drainage.
7. Please provide road profiles for the access road into the site.
8. Make sure the entrance does not exceed 4% grade for a distance of 40' from the
intersected street, measured anywhere in the entrance to reduce the storm flow across
travel ways. [ 18- 4.12.17]
9. Please show entrance with a VDOT designation (PE -1, CG -9a, etc)
10. Curb inlets will be required on each side of entrance roads to capture stormwater runoff
prior to entering intersections or crossing travel ways.
11. Horizontal and vertical road alignment will need to match the SDP200100089 plan.
12. Please demonstrate how the road design accommodates Albemarle County's long -range
plans for sanitary sewer and waterlines, including the require easements.
13. Please label the widths for the sidewalk and planting strips along the public road.
14. Temporary grading easements are required from adjoining parcels 1D (Dominion Crane
& Rigging, Inc.) and 13 (County of Albemarle School Board).
15. Final Site Plan may require additional off -site grading easements for E &SC and SWM structures.
16. Final site plan will address all requirements of 18 -32.6 prior to final approval.
file: El_psp_MRG_Albemarle Health and Rehabilitation Center.doc