HomeMy WebLinkAboutWPO201200040 Review Comments Erosion Control Plan 2012-05-04� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Stillhouse Pump Station WPO- 2012 -00040 Plan preparer: Mr. Charles Votava, PE; Michael Baker Jr., Inc. [parcese @ mbakercorp.com] Owner: Rivanna Water and Sewer Authority [dmarch @rivanna.org] Representative: Mr. Doug March, PE; Rivanna Water and Sewer Authority Plan received date: 25 August 2011 Date of comments: 19 September 2011 Reviewer: Phil Custer B. Stormwater Management Plan Review 1. SWM plan appears to meet the minimum requirements set forth in the County Ordinance. C. Erosion & Sediment Control Plan Review 1. Please show the Albemarle Paved Construction entrance on the plan. 2. The Temporary Paved Wash Rack description in the narrative shall have a note stating "A minimum water tap of 1" must be installed with a minimum 1" ball -cock shutoff valve supplying a wash hose with a diameter of 1.5" for adequate constant pressure. Wash water must be carried away from the entrance to an approved settling area to remove sediment. All sediment shall be prevented from entering storm drains, ditches or water courses. Should the temporary construction entrance not be maintained properly or an excessive amount of soil found tracked onto the public roadway, then a paved construction entrance, water tanker truck with 2 pressure washers and a settling area may be required by the erosion and sediment control program administrator." 3. The 18" HDPE pipe from the storage tank will need anchorage to resist failure. Please use the VDOT pipe anchorage system for pipe slopes in excess of 16 %. 4. The 18" HDPE pipe from the storage tank will need to be extended to the 100 year flood plain or level ground. It appears at least 180' of pipe is required as a minimum. Please see Std. & Spec. 3.18 design criteria, pipe outlets. Once these comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mcreene @albemarle.orc to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: CDDEI_esc swm_MRG_Stillhouse Pump Station.doc