Loading...
HomeMy WebLinkAboutSDP201200025 Review Comments Critical Slope Waiver 2012-05-14*—&A County of Albemarle Department of Community Development Memorandum To: Joanne Purtsezova, Planning From: Glenn Brooks, Engineering Date: 14 May 2012 Subject: Verizon Wireless Tier 2 Site Modes, Vest Property (SDP201200025)critical slope waiver request The critical slope waiver request has been reviewed. The engineering analysis of the request follows: Description of critical slope area and proposed disturbance: This is a wooden mountain side above residences. The applicant is proposing a new site for a new tower to replace an old wooden tower. Areas Acres Total site 10,000 sf lease area on a 2.16 acre parcel (existing lease area is 382sf) Critical slopes 638sf Remainder of lease area Critical slopes disturbed 638sf 100% of critical slopes in lease area Exemptions to critical slopes waivers for driveways, roads and utilities without reasonable alternative locations: To date, cell towers and equipment sites have not been considered utilities which are exempt from critical slopes waivers. Compliance with Zoning Ordinance 18 -4.2: "movement of soil and rock" Proper retaining wall construction, control of drainage, and vegetative stabilization will prevent any movement of soil. "excessive stormwater runoff' Stormwater runoff has not been addressed, but the site is fairly small. "siltation" This site is small enough that it will probably not require an erosion control plan and inspection. "loss of aesthetic resource" Planning should speak to this concern. "septic effluent" This use has no sewage. Based on the review above, there are no engineering concerns which prohibit the disturbance of the critical slopes as shown. However, it is recommended that the equipment pad be moved down the slope out of the critical area. If there is sufficient explanation to the Board as to why this cannot be done, engineering does not have any concerns with impacts for this small site. file: Mew w GEB Verizon and Vest.doc