HomeMy WebLinkAboutSUB200800054 Review Comments Bond Estimate 2012-05-07Hyland Ridge Phase 1 SUB200800054
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Item
Item
No. Unit
Unit Cost
Cost
Number
installed
% compete
cost remaining
Fontana Drive 10 +00 to 19
+30 road length 930.0 ft
1
aggregate base 8.0 in d
930.0 ft L 26.0 ft W
597.0 cy
$35.91
$21,439.60
0%
$21,439.60
2
blotted or prime &double seal
0.0 ft L 0.0 ft W
0.0 sy
$6.30
$0.00
0%
$0.00
3
asphalt base 3.0 in d
930.0 ft L 26.0 ft W
338.5 tons
$73.50
$24,881.22
0%
$24,881.22
4
asphalt surface 2.0 in d
930.0 ft L 26.0 ft W
225.7 tons
$81.90
$18,483.19
0%
$18,483.19
6
curb CG -2
0.0 ft
$8.40
$0.00
0%
$0.00
7
curb CG -6
1860.0 ft
$13.83
$25,721.01
0%
$25,721.01
8
sidewalk, asphalt 0.0 in d
0.0 ft L 0.0 ft W
0.0 tons
$73.50
$0.00
0%
$0.00
9
sidewalk, concrete 5' width
1860.0 ft
$15.75
$29,295.00
0%
$29,295.00
10
ramp CG -12
2
$315.00
$630.00
0%
$630.00
11
street name sign
1
$65.00
$65.00
0%
$65.00
12
traffic control sign
4
$49.35
$197.40
0%
$197.40
13
Street Landscape
0 Each
0
$105.00
$0.00
0%
$0.00
13
guardrail
0 ES @ $3700
0.0 ft
$16.80
$0.00
0%
$0.00
14
manhole or drop inlet
6
$1,365.00
$8,190.00
0%
$8,190.00
16
pipe, rcp (15 to 48 ") 18.0 in d
0 ES -1,2 $250
0 EC -1 $200
290.0 ft
$27.30
$7,917.00
0%
$7,917.00
17
pipe, rcp (15 to 48 ") 48.0 in d
0 ES -1,2 $250
0 EC -1 $200
0.0 ft
$126.00
$0.00
0%
$0.00
18
pipe, pvc (4 to 10 ") 8.0 in d
0.0 ft
$6.30
$0.00
0%
$0.00
19
pipe, cmp (15 to 48 ") 15.0 in d
0 ES -1,2 $250
0 EC -1 $200
0.0 ft
$23.10
$0.00
0%
$0.00
20
pipe, cmp (54 to 72 ") 60.0 in d
0 ES -1,2 $250
0 EC -1 $200
0.0 ft
$146.00
$0.00
0%
$0.00
21
rip -rap, placed
0.0 ton
$31.50
$0.00
0%
$0.00
22
E &S fabric,EC -2,3
1395 ft L 4 ft W
0.0 sy
$10.50
$0.00
0%
$0.00
23
clear and grub (for wooded sites)
0.0 ft L 0.0 ft W
0.0 acre
$10,500.00
$0.00
0%
$0.00
24
grading (per cy for cut or import only
1481.0 cy fill 500.0 cy cut
1481.0 cy bal
$3.15
$6,240.15
0%
$6,240.15
24
CBR tests (1 every 0.1 mi. per road)
930.0 ft L 1.86 inc of 500'
3
$157.50
$456.75
0%
$456.75
25
as -built drawings (1 k +price per 0.1
930.0 ft L 0.176 mi.
2
$1,050.00
$3,100.00
0%
$3,100.00
26
survey and layout (price per 0.1 mi.)
930.0 ft L 0.176 mi.
2
$525.00
$2,050.00
0%
$2,050.00
27
mobilization
1
$525.00
$525.00
0%
$525.00
28
VDOT surety (1 lane)
930.0 ft L 0.176 mi.
2 Lanes
$2,000.00
$7,045.45
0%
$7,045.45
29
VDOT maintenance fee (1 In rd, 1 yr)
930.0 ft L 0.176 mi.
2 Lanes
$150.00
$528.41
0%
$528.41
30
VDOT admin. Cost recovery fee(1 lar
930.0 ft L 0.176 mi.
2 Lanes
$100.00
$602.27
0%
$602.27
cost sum
$157,367.46
$157,367.46
proj mgmt
$23,605.12
$23,605.12
contingency
$18,097.26
$18,097.26
Total $199,070 $199,070
5/11/2012
Hyland Ridge Phase 1 SUB200800054
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Item
Item
No. Unit
Unit Cost
Cost
Number
installed
% compete
cost remaining
Fontana Drive 19 +30 to 25
+50 road length 620.0 ft
1
aggregate base 8.0 in d
620.0 ft L 30.0 ft W
459.3 cy
$35.91
$16,492.00
0%
$16,492.00
2
blotted or prime &double seal
0.0 ft L 0.0 ft W
0.0 sy
$6.30
$0.00
0%
$0.00
3
asphalt base 3.0 in d
620.0 ft L 30.0 ft W
260.4 tons
$73.50
$19,139.40
0%
$19,139.40
4
asphalt surface 2.0 in d
620.0 ft L 30.0 ft W
173.6 tons
$81.90
$14,217.84
0%
$14,217.84
6
curb CG -2
0.0 ft
$8.40
$0.00
0%
$0.00
7
curb CG -6
1240.0 ft
$13.83
$17,147.34
0%
$17,147.34
8
sidewalk, asphalt 0.0 in d
0.0 ft L 0.0 ft W
0.0 tons
$73.50
$0.00
0%
$0.00
9
sidewalk, concrete 5' width
1240.0 ft
$15.75
$19,530.00
0%
$19,530.00
10
ramp CG -12
7
$315.00
$2,205.00
0%
$2,205.00
11
street name sign
1
$65.00
$65.00
0%
$65.00
12
traffic control sign
8
$49.35
$394.80
0%
$394.80
13
Street Landscape
0 Each
0
$105.00
$0.00
0%
$0.00
13
guardrail
4 ES @ $3700
0.0 ft
$16.80
$14,800.00
0%
$14,800.00
14
manhole or drop inlet
0
$1,365.00
$0.00
0%
$0.00
16
pipe, rcp (15 to 48 ") 18.0 in d
0 ES -1,2 $250
0 EC -1 $200
550.0 ft
$27.30
$15,015.00
0%
$15,015.00
17
pipe, rcp (15 to 48 ") 48.0 in d
0 ES -1,2 $250
0 EC -1 $200
0.0 ft
$126.00
$0.00
0%
$0.00
18
pipe, pvc (4 to 10 ") 8.0 in d
0.0 ft
$6.30
$0.00
0%
$0.00
19
pipe, cmp (15 to 48 ") 15.0 in d
0 ES -1,2 $250
0 EC -1 $200
0.0 ft
$23.10
$0.00
0%
$0.00
20
pipe, cmp (54 to 72 ") 60.0 in d
0 ES -1,2 $250
0 EC -1 $200
0.0 ft
$146.00
$0.00
0%
$0.00
21
rip -rap, placed
0.0 ton
$31.50
$0.00
0%
$0.00
22
E &S fabric,EC -2,3
930 ft L 4 ft W
0.0 sy
$10.50
$0.00
0%
$0.00
23
clear and grub (for wooded sites)
0.0 ft L 0.0 ft W
0.0 acre
$10,500.00
$0.00
0%
$0.00
24
grading (per cy for cut or import only
600.0 cy fill 500.0 cy cut
600.0 cy bal
$3.15
$3,465.00
0%
$3,465.00
24
CBR tests (1 every 0.1 mi. per road)
620.0 ft L 1.24 inc of 500'
2
$157.50
$362.25
0%
$362.25
25
as -built drawings (1 k +price per 0.1
620.0 ft L 0.117 mi.
2
$1,050.00
$3,100.00
0%
$3,100.00
26
survey and layout (price per 0.1 mi.)
620.0 ft L 0.117 mi.
2
$525.00
$2,050.00
0%
$2,050.00
27
mobilization
1
$525.00
$525.00
0%
$525.00
28
VDOT surety (1 lane)
620.0 ft L 0.117 mi.
2 Lanes
$2,000.00
$4,696.97
0%
$4,696.97
29
VDOT maintenance fee (1 In rd, 1 yr)
620.0 ft L 0.117 mi.
2 Lanes
$150.00
$352.27
0%
$352.27
30
VDOT admin. Cost recovery fee(1 lar
620.0 ft L 0.117 mi.
2 Lanes
$100.00
$484.85
0%
$484.85
cost sum
$134,042.72
$134,042.72
proj mgmt
$20,106.41
$20,106.41
contingency
$15,414.91
$15,414.91
Total $169,570 $169,570
5/11/2012
Hyland Ridge Phase 1 SUB200800054
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Item
Item
No. Unit
Unit Cost
Cost
Number
installed
% compete
cost remaining
Hyland Creek
Circle 10 +00 to 23 +39.2, road length 1339.2 ft
1
aggregate base 6.0 in d
1339.2 ft L 28.0 ft W
694.4 cy
$35.91
$24,935.90
0%
$24,935.90
2
blotted or prime &double seal
0.0 ft L 0.0 ft W
0.0 sy
$6.30
$0.00
0%
$0.00
3
asphalt base 3.0 in d
1339.2 ft L 28.0 ft W
525.0 tons
$73.50
$38,585.03
0%
$38,585.03
4
asphalt surface 1.5 in d
1339.2 ft L 28.0 ft W
262.5 tons
$81.90
$21,497.37
0%
$21,497.37
6
curb CG -2
0.0 ft
$8.40
$0.00
0%
$0.00
7
curb CG -6
2678.5 ft
$13.83
$37,039.64
0%
$37,039.64
8
sidewalk, asphalt 0.0 in d
0.0 ft L 0.0 ft W
0.0 tons
$73.50
$0.00
0%
$0.00
9
sidewalk, concrete 5' width
2678.5 ft
$15.75
$42,186.38
0%
$42,186.38
10
ramp CG -12
0
$315.00
$0.00
0%
$0.00
11
street name sign
2
$65.00
$130.00
0%
$130.00
12
traffic control sign
4
$49.35
$197.40
0%
$197.40
13
Street Landscape
0 Each
0
$105.00
$0.00
0%
$0.00
13
guardrail
4 ES @ $3700
0.0 ft
$16.80
$14,800.00
0%
$14,800.00
14
manhole or drop inlet
16
$1,365.00
$21,840.00
0%
$21,840.00
16
pipe, rcp (15 to 48 ") 18.0 in d
0 ES -1,2 $250
0 EC -1 $200
1250.0 ft
$27.30
$34,125.00
0%
$34,125.00
17
pipe, rcp (15 to 48 ") 48.0 in d
0 ES -1,2 $250
0 EC -1 $200
280.0 ft
$126.00
$35,280.00
0%
$35,280.00
18
pipe, pvc (4 to 10 ") 8.0 in d
0.0 ft
$6.30
$0.00
0%
$0.00
19
pipe, cmp (15 to 48 ") 15.0 in d
0 ES -1,2 $250
0 EC -1 $200
0.0 ft
$23.10
$0.00
0%
$0.00
20
pipe, cmp (54 to 72 ") 60.0 in d
0 ES -1,2 $250
0 EC -1 $200
0.0 ft
$146.00
$0.00
0%
$0.00
21
rip -rap, placed
0.0 ton
$31.50
$0.00
0%
$0.00
22
E &S fabric,EC -2,3
2008.8 ft L 4 ft W
0.0 sy
$10.50
$0.00
0%
$0.00
23
clear and grub (for wooded sites)
0.0 ft L 0.0 ft W
0.0 acre
$10,500.00
$0.00
0%
$0.00
24
grading (per cy for cut or import only
600.0 cy fill 500.0 cy cut
600.0 cy bal
$3.15
$3,465.00
0%
$3,465.00
24
CBR tests (1 every 0.1 mi. per road)
1339.2 ft L 2.678 inc of 500'
4
$157.50
$582.75
0%
$582.75
25
as -built drawings (1 k +price per 0.1
1339.2 ft L 0.254 mi.
3
$1,050.00
$4,150.00
0%
$4,150.00
26
survey and layout (price per 0.1 mi.)
1339.2 ft L 0.254 mi.
3
$525.00
$2,575.00
0%
$2,575.00
27
mobilization
1
$525.00
$525.00
0%
$525.00
28
VDOT surety (1 lane)
1339.2 ft L 0.254 mi.
2 Lanes
$2,000.00
$10,145.45
0%
$10,145.45
29
VDOT maintenance fee (1 In rd, 1 yr)
1339.2 ft L 0.254 mi.
2 Lanes
$150.00
$760.91
0%
$760.91
30
VDOT admin. Cost recovery fee(1 lar
1339.2 ft L 0.254 mi.
2 Lanes
$100.00
$757.27
0%
$757.27
cost sum
$293,578.11
$293,578.11
proj mgmt
$44,036.72
$44,036.72
contingency
$33,761.48
$33,761.48
Total $371,380 $371,380
5/11/2012