HomeMy WebLinkAboutSDP201200001 Review Comments Minor Amendment 2012-05-11Christopher Perez
From:
Christopher Perez
Sent:
Friday, May 11, 2012 3:14 PM
To:
Christopher Perez; 'Chris Haine'
Cc:
'Tom Gallagher'; 'Peter Melmed'; Margaret Maliszewski; Mark Graham; Bill Fritz; David Benish
Subject:
Site plan amendments signature
Chris,
Stonefield Town Center:
I've completed my review of the Stonefield Town Center plans and have provided my comments below:
1) It appears that the cover sheet incorrectly lists which pages have been modified with this minor amendment. Notably,
the cover sheet lists 1, 11 -13, 23, 28 -29, 33 -34, 41 -44 as having changed from the approved final SDP, however; in
addition to the pages listed, the following pages have also been modified from the approved final SDP: pages 4, 7, 8, 9,
10, 14 -22, 24 -25, 27, 35 -38, 45 -48. Additionally, Appendix 1 -22 was not included in the approved final SDP, thus it
should also be called out on the cover sheet as having been modified since the final approved SDP.
I plan to redline the above pages on the cover sheet as having been modified through clouding them as the others have
been clouded. Is this ok with you and your Engineer's that I redline the cover sheet for these plans? Otherwise provide a
revised cover sheet for each plan to be signed with the above revisions.
The above is merely for consistency purposes, as you provided and entire revised plan which includes every sheet.
Essentially this minor amendment plan will replace the previously approved final SDP, which will make it easier to use
due to the amount of changes.
2) While you received ARB approval of the plan, I need to assure ARB is fine with this final copy for signature. Margareta
is out of the office today and Monday but she should be back Tuesday at which point I'll ask her if she's ok with the plans
as submitted.
Once the above have been addressed, the plans should be ready to sign; last I spoke to Phil he did not have any pending
concerns.
Building CHV (Cinema):
I've completed my review of the Cinema plans and have provided my comments below:
1) It appears that the cover sheet incorrectly lists which pages have been modified with this minor amendment. Notably,
the cover sheet lists 1, 7, 8, 17, 19, 26 -28 as having changed from the approved final SDP, however; in addition to the
pages listed, the following pages have also been modified from the approved final SDP: pages 2, 4, 9 -11, 13 -19, 23, 26-
28, 31, 32, 32.1, 32.2, 33, 34, 34.1.
I plan to redline the above pages on the cover sheet as having been modified through clouding them as the others have
been clouded. Is this ok with you and your Engineer's that I redline the cover sheet for these plans? Otherwise provide a
revised cover sheet for each plan to be signed with the above revisions.
2) Additionally, page 35 sheet LS -4 "Guard Rail Details" formerly titled as "SWM Landscape Plan" has been omitted from
the plan? Unless ARB has determined this page to be unnecessary, please provide a slip sheet of this page for all the
plans to be signed.
The above is merely for consistency purposes, as you provided and entire revised plan which includes every sheet.
Essentially this minor amendment plan will replace the previously approved final SDP, which will make it easier to use
due to the amount of changes.
3) While you received ARB approval of the plan, I need to assure ARB is fine with this final copy for signature. Margareta
is out of the office today and Monday but she should be back Tuesday at which point I'll ask her if she's ok with the plans
as submitted.
Once the above have been addressed, the plans should be ready to sign; last I spoke to Phil he did not have any pending
concerns.
If you have any questions feel free to call me, or email me.
Thanks
Christopher P. Perez I Senior Planner
Department of Community Development I County of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3443
From: Chris Haine [mailto:CHaine@edens.com]
Sent: Friday, May 11, 2012 12:20 PM
To: Christopher Perez
Cc: Tom Gallagher; Peter Melmed
Subject: Site plan amendments signature
Chris,
Can you advise on the status of signatures on minor site plan amendment plans which are required for release of B3 blgd
permit?
FYI, Tom Gallagher informed me the bond payments were delivered to the county yesterday.
Thx
Chris Haine,
AIA
Planning & Development Manager
EDENS
7200 Wisconsin Avenue, Suite 400
Bethesda, MD 20814
www.EDENS.com
(301) 347 -3736 1 C
(301) 518 -7137 1 F
(301) 652 -3588
facebook.com /WEareEDENS
@WEareEDENS
NOTICE: This communication may contain information that is confidential to EDENS. If you are not the intended recipient of this communication, please delete and
destroy all copies and immediately notify EDENS by sending a reply e-mail to the sender of this message. If you are the intended recipient of this communication,
you should not copy, disclose or distribute this communication without EDENS' authority. Any views expressed in this communication are those of the individual
sender, except where the sender specifically states them to be EDENS' views. Except as required by law, EDENS does not represent, warrant or guarantee that
the integrity of this communication has been maintained nor that the communication is free of errors, virus, interception or interference.