Ellie,
The above referenced project is currently under construction review by ACSA staff. Please instruct the applicant to
resubmit 3 sets of construction drawings to the ACSA reviewer with previous comments addressed. The applicant should
be advised that dedication of the Hollymead Town Center Area C Block 9 utilities is required prior to construction
approval.