Loading...
HomeMy WebLinkAboutWPO201200008 Review Comments Erosion Control Plan 2012-05-16Philip Custer From: Philip Custer Sent: Wednesday, May 16, 2012 6:30 PM To: kirsten @collins - engineering.com; Scott Collins (scott @collins - engineering.com) Collins Cc: Ana Kilmer; Mark Hopkins Subject: RE: Engineering review of Old Trail Creekside III II Good evening, I have reviewed the updated sheets that were emailed to me this past week and all outstanding issues have been addressed. The Road, ESC, SWM, and mitigation plans (WPO- 2012 -00008 and SUB- 2012 - 00010) are hereby approved. Once all (subdivision and WPO) bonds are posted and the stormwater management maintenance agreement recorded, engineering review will have no objection to the approval of the final plat (SUB- 2012 - 00010). -The Stormwater management bond has been computed to be $73,300. -The mitigation bond has been computed to be $66,500. -The ESC bond has been computed to be $139,300. -The total road bond has been computed to be $525,310. The road bond has been broken up into three phases. The bond for Phase A is $190,150. The bond for Phase B is $152,690. The bond for Phase C is $182,470. Only the bond for Phase A must be posted before SUB - 2012 -00010 is signed by the county. Please contact Ana Kilmer at 296 -5832 x3246 to post these bonds. As a reminder, the owner of TMP 55E -4 - -A must be party to the WPO bond. I will need additional copies of the plan to pass off to the various county inspectors. I will need 4 copies of the ESC plan (full sets including adequate channel exhibit), 1 copy of the SWM /mitigation plan(all sheets including adequate channel exhibit except for ESC and landscape sheets), and 4 copies of the Road Plan(all sheets excluding SWM, adequate channel exhibit, and ESC). I currently have 6 copies of the plan signed 17 April 2012, but these sets need all sheets that have been updated since replaced. Please contact me and let me know how you would like to submit these remaining sets. A grading permit will be issued in the preconstruction meeting. A pre- construction meeting can only be held after the first year inspection and permit fee have been paid, the copies of the set listed above provided to me, the WPO bonds posted, and the stormwater management maintenance agreement recorded. Please let me know if you have any questions. Thanks, Phil 296 -5832 x3072 From: Philip Custer Sent: Wednesday, May 09, 2012 6:41 PM To: Scott Collins (scoff @collins- engineering.com) Collins; kirsten @collins- engineering.com; Adam Long Cc: Ana Kilmer; Ellie Ray Subject: Engineering review of Old Trail Creekside III II Good evening, I have reviewed the latest submittal of the ESC, SWM, road, and mitigation plans for Old Trail Phase III Phase II (WPO- 2012 -00008 and SUB - 2012 - 00010), received 19 April 2012. The plans require slight modifications, which can be worked out over email. When all the following changes have been made, please attach all pdfs in one email and send them to me at the same time: 1. (SWM) The set does not contain a routing of the 100 -year storm as was previously shown on the adequate channel exhibit. Please provide me with this routing and other supplemental information that was shown on this sheet but was not included in the latest submittal. This can be provided in 8.5" x 11" pages. 2. (Road) Please show sidewalk on both sides of the typical cross - section on S -2. 3. (ESC and the plat) In sheets ESC -2 and ESC -3, please show the new channel downstream of the biofilter and expand the limits of disturbance to include it. Also, this work appears on TMP 55E -4 - -A outside of the existing easement. Both properties (TMP 55 -78 and TMP 55E -4 - -A) will need to be included on the WPO bond. This easement may also need to be expanded on the current plat and the owner of TMP 55E -4 - -A may need to sign the cover. 4. (ESC and the plat) It has been brought to my attention that in order to construct this subdivision as designed, a sewer lateral will need to be built across 55E -4 - -4. There is an existing easement, but in order to grant an ESC permit, the county must verify that the easement is adequate not to require the owner to be party to the WPO bond. I'm not sure how long it will take the county attorney's office to review and approve this. Considering the applicant's time sensitivity to record this plat, other alternatives will likely be quicker. One of those alternatives is to show a sanitary sewer lateral on the construction plan, and a private easement on the plat, across Wellbourne and the across the north end of Lot 7 to the new sanitary sewer main. Another is to remove Lot 22 from the plat and the lateral from the construction plan. Lot 22 can later be created with the Phase B plat. 5. (Mitigation) Eliminate Impact Area #1 and mark this facility with the note: "Sediment Trap and Future Biofilter Location [17- 320.B] ". Increase Impact Area #2 to include all of Birchwood Hill Road construction in the stream buffer, even the overlap with the sewer line. The net result is in the applicant's favor, but since there will be "overmitigation ", I want to make sure it is accurately documented for the next phase. All other technical aspects of the construction plans and plat have been addressed. The following administrative items must be noted at this time. 6. (WPO) The last submittal was accompanied by a check for $900 that was entered with the WPO. As of today, 6 ESC or SWM reviews have occurred and 1 mitigation plan has been submitted. This requires $1950 in fees. As of today, $2100 has been paid to this application. Please let me know the particular reason for the $900 payment. The county may need to process a $150 refund. (A third road fee will not be required because all changes were graphical.) 7. (SWM) A Stormwater Agreement must be recorded before the plat can be approved or a grading permit can be provided. 8. (ESC and the plat) Unless existing easements are approved by the County Attorney's Office, all properties disturbed with this application must be party to the WPO bond —see comments #3 and #4 above. (The road bond only needs to be posted by the owner of TMP 55 -78.) The bonds for ESC, SWM, mitigation, and road will be provided soon. The plat cannot be approved by the county until all bonds are posted. Please let me know if you have any questions. Thanks, Phil 296 -5832 x3072 4