Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201200008 Review Comments Bond Estimate 2012-05-16
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Old Trail Creekside Phase III Phase II PROJECT NUMBER: WPO- 2012 -00008 DATE OF ESTIMATE: 05/16/12 ESTIMATE BY: PBC BASED ON: Plans signed 4/17/2012 with updates submitted 5/16/2012 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 12.31 1500 18465 SILT FENCE LF 3750 5 18750 SAFETY FENCE LF 600 3 1800 TREE PROTECTION FENCE LF 5800 3 17400 DIVERSION DIKE /DIVERSION LF 2300 3 6900 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT BASN 1 ACRES 3.81 1000 3810 SEDIMENT BASIN 2 ACRES 15.26 1000 15260 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 23 200 4600 OUTLET PROTECTION EA 4 200 800 EC -2 & 3 DITCH PROTECTION LF 1521 10 15210 RIP -RAP LF 85 55 4675 CHECK DAMS SQ.YD. 14 30 420 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 110090.00 project management 16513.50 subtotal 126603.50 CONTINGENCY LS 10% 12660.35 TOTAL 139263.85 BOND AMOUNT REQUIRED 139300.00