Loading...
HomeMy WebLinkAboutWPO201200013 Review Comments Stormwater Management Plan 2012-05-22�� OF A i" A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Old Trail Village Block 11 WP0201200013 SDP201200009 Plan preparer: Scott Collins Engineering [293 -3719] Owner or rep.: March Mountain Properties, LLC Plan received date: 8 February 2012 19 April 2012 Date of comments: 19 March 2012 22 May 2012 Reviewer: Michael Koslow Review Coordinator: Megan Yaniglos The second site plan and comps set (SDP201200009) and WPO plan and calculation set (WP0201200013) submitted on and before 19 April 2012 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Addressed comments have been removed for clarity. Please adequately address the following comments for final approval: A. General (SDP201200009 and WP0201200013) 1. Final application for this review will need to be signed by the applicant. (Rev2) Comment has been acknowledged but not addressed. B. Final Site Plan and Comps set (SDP201200009) C. Erosion and Sediment Control Plan (WP0201200013) 10. The baffle will not work as intended by the applicant. (Rev2) Reconfigured baffle does not appear to provide a significantly increased flow path toward outflow riser. Recommend lengthening baffle in northeast direction by 50 : This wouldprovide a length -to -width ratio for the flow path greater than 2:1 as detailed in VESCHp. III -92. 12. Please provide an analysis of the downstream channel. Please refer to the design manual for all expectations regarding a downstream channel analysis. The I% rule must be applied using the total development acreage of Old Trail Village, not just that of this phaseiblock. (Rev2) It appears the outlet for the proposed bioretention basin drains toward Slabtown Branch. However, from the plan depicted on sheets SWM -1 and SWM -2, it is ambiguous whether the outlet crosses the property line for this development's parcel. Please revise the depiction of the proposed bioretention basin on sheets SWM -1 and SWM -2 to demonstrate an adequate riprap ditch to Slabtown Branch (see also comment C13 below). Per meeting with applicant on April 12, 2012, the demonstration of adequate channel for Slabtown Branch will be waived due to additional detention for proposed Old Trail Village projects in Lickinghole Basin if a proposed individual land disturbing project could meet the pre- development condition's outfall detention (see also comment D5). Engineering Review Comments Page 2 of 2 13. (Rev2) Proposed land disturbance through the stream buffer for Slabtown Branch and within the tree conservation area must be minimized. Please outlet the sediment basin / bioretention basin to the road embankment for Old Trail Drive and provide a riprap channel from the basin outlet to Slabtown Branch. D. Stormwater Management Plan (WP0201200013) 3. (Rev2) Sheet SWM -2 depicts a Nyloplast 15 In. Standard Grate Assembly for the proposed bioretention basin's inlet structure. Flat grates for trash racks are not acceptable [VSMH 3.02- 221. Please revise the proposed basin's inlet structure to include a concave inlet shape to mitigate clogging. 4. (Rev2) The proposed routing calculations apply a reduction to the inflow hydrograph (fudge factor) of 0.78. Use of inflow hydrograph reduction factors was not authorized by county engineering when MS -19 requirements were discussed with Applicant on April 12, 2012. 5. (Rev2) The proposed biofilter bed is not large enough to meet treatment requirements. Considering the three 3" diameter orifice elevations, only about 1,600 cft of runoff is treated when 11,767 cft of runoff treatment is required. County engineering would also accept a facility with a bed footprint of 7,060 sft for 282,396 sft of impervious area within it's watershed, assuming 1 ft (maximum) of ponding [Albemarle County Design Standards Manual `Bio- filter Combined with Detention Basin" detail]. 6. (Rev2) Please remove sheets SWM -3 and SWM -4 from the plans. These sheets do not appear to apply to the project. 7. (Rev2) Please propose a landscape planting plan for the proposed biofilter. 8. (Rev2) Proposed forebay gabion basket separators depicted on `Biofilter" section on sheet SWM -2 must be laid on top of media mix. The gabion basket riprap appears as though it would act as a draw for runoff to bypass the filter media. Once the Erosion & Sediment Control and Stormwater Management [WP0201200013] comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Community Development Engineering along with the required review fee and transmittal form. Community Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslowgalbemarle.org to schedule an appointment. [17- 204.f1 An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). Filc: