Loading...
HomeMy WebLinkAboutSP201200011 Review Comments Special Use Permit 2012-07-06�oF a a$ o ®� vIRGIr}i�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4176 July 6, 2012 Barbara Kalemba - Sliwinski 254 Lakeview Dr Charlottesville VA 22901 RE: SP201200011 Four Seasons Learning Center 1St Review Comment Letter on Amendment to Special Use Permit received May 21, 2012. Ms. Kalemba - Sliwinski: As you know, in 2010 your facility proposed to increase the number of students permissible from 40 to 64, an increase of 24 students. Staff recommended denial /dis- approval based on findings that the scale of the operation at 40 students was at the upper end of what should be allowed. On March 9, 2011 the BOS reviewed the request and subsequently approved the facility for an additional 14 children, for a total number of 54 children. Conditions were placed on the approval of the Special Use Permit which limits the number of children to 54 based on concerns of increased traffic and scale of the development in correlation to the surrounding neighborhood. After reviewing the current proposal staff continues to have concerns about the potential scale of the day care in relation to the neighborhood. Be aware that the current conditions from the original application have not changed. While the current proposal is only for 6 additional students, the total number of students, 60, is nearing the initial number of students requested in 2010. To assure that staff is understanding the current request correctly, please clarify: is the request for 6 additional children, or is the request for 6 additional children that will only be brothers or sisters (siblings) of existing students? Also, after having recently reviewed the minutes from the public hearings at both the Planning Commission and the Board of Supervisor meetings during the initial Special Use Permit application, it appears there was substantial public participation at both meetings in opposition of the project. Have you had any contact with the neighborhood about the current proposal to increase the student population at your facility? If not, we encourage you to discuss the proposal with them as soon as possible. Please respond to the above questions and then take one of the actions identified in the "Action After Receipt of Comment Letter" which is attached. Pleae feel free to contact me if you wish to meet or need additional information. Notification and Advertisement Fees Recently, the Board of Supervisors amended the zoning ordinance to require that applicants pay for the notification costs for public hearings. Prior to scheduling a public hearing with the Planning Commission, payment of the following fees is needed: $220.80 Cost for newspaper advertisement Page 1 of 2 $204.23 Cost for notification of adjoining owners (minimum $200 + actual postage /$1 per owner after 50 adjoining owners) $425.03 Total amount due prior to Planning Commission public hearing Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing needed. $220.80 Additional amount due prior to Board of Supervisors public hearing $645.83 Total amount for all notifications Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Feel free to contact me if you wish to meet or need additional information at 434.296.5832 ext 3443. My email address is cperez@albemarle.org. Sincerely, Christopher P. Perez Senior Planner Planning Division enc: Action After Receipt of Comments Resubmittal Schedule Resubmittal Form Page 2 of 2 % -06 -12 DEPARTMENT OF COMMUNITY DEVELOPMENT pq AL� • ��� +IGIi`�ZF ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments. (2) Request. indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) withdraw your application (1) Resubmitta) in Response to Review Comments if you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the last page of your comment letter with your submittal• The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal. requires an additional fee. (See attached Feb schedule.) (2) Request Indefinite Deferral if you planto resubmit after 30 days from the date of the comment letter, you need to request an indefinite deferral. Please provide a written request and state your justification for requestingthe deferral. (Indefinite deferral means that you intend to resubmit /request a public hearing beset with the Planning Commission after the 3D .day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a-public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of. resolution that can be addressed with a resubmittal. After outstanding issues have been resolved and /or when you are ready to request a public hearing, staff will set your public hearing date forthe Planning Commission in accordance with Page 1 of 6 Revised 4 -2341 eke the Planning Commission's published schedule and as mutually agreed by you and the County. The staff report and recommendation will be based,on•the.latest information provided by you. With your initial submittal or resubmittal. Please remember that all resubmittals must be'made on or before a resubmittal date. By no later than twenty -one 1 (21.) days before the Planning Commission's public hearing, a newspaper advertisementfee and an.adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment letter will contain the actual fees you need to*pay. Payment for an additional newspaper advertisement is also required twenty -two (22) days prior to the Hoard of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Pubiic.Hearings form. please'be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing-will be allowed during the life'ofthe application. The only exception to this rule wIll.be ei traordlnary circumstances, such as a major. change, in the project proposal bythe applicant or more issues identified'by staff that have not previously. been brought to the applicant's attention, As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at anytime you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days,'we will contact you again. At that time, you will.be given '1.0 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Plan ning�Commissi on- date as mutually agreed.to with staff, or c) request indefinite deferral and state your justification for requesting-the deferral, If none.ofthese choices is made within'.10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or.the latest submittal staff received on a resubmittal date. Fee Payment Fees maybe paid in cash,or by check and must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator, page 2 of 6 Revised 4 -25 -11 eke FEE SQEMDULE FOR ZONING APPLICATIONS A. For a special use permit: 1. Additional lots under section 10.5.2.1; application and first •resubmission Fee........................................................................ ..I..................I........I ......................$7,000.00 Eachadditional resubmittal ...................................... ............................... ........................$500.00 2, Public utilities; application and first resubmission Fee................... .............................. ............. ............................... ......................$1,000:00 Eachadditional resubmittal .....................................:. ............................... ........................$500.00 3. -Day care center; application and first resubmission Fee....; .:..................................................................... ............................... ......................$1,000.00 Eachadditional resubmittal ................. .......:.............. ............................... ........................$500.00 4. Horne occupation Class B; application and first resubmission Fee...... ................................................ ..................... ............................... ..:...................$1,000.00 Eachadditional resubmittal ........................................ ............................... ........................$500.00 5, 5. Amend existing special use permit; application and first resubmission Fee................................... . ..... . ................ . ................. . ........ I ............. I ......................... .....$1,000.00 Eachadditional re'submittal ................. I.................:........ ..................,..,..$500.00 6. Extend existing special use permit; application and first resubmission Fee .................................................................................... ..............I................ ;.............$1,000.00 Eachadditional resubmittal ................................. ............................... . ........................$500.00 7, All other special'use permits; application and first resubmission. Fee ............................................................................ ............................... ......................$2,000.00 Eachadditional resubmittal ........................................................... .............. :................ $1,000.00 8. Deferral of scheduled public hearing at applicant's request Fee ............................................................................................................ ............:..........$180.Q0 B.'-!,or amendment to text of zoning ordinance: . .............. . .............................. I ...... I............. ....... .........................I..... .......................$1000.00 e C. Am dment to the zoning map: Z, Les than 50 acres; application and first resubmission Fee......... ...............:.................................................. ............................... ......................$2,500.00 2. . Less than acres; each additional resubmission Fee................ ............................... .......:....................... ................. .....................$.1,250.00 3. 50 acres or Brea. • application and first resubmission Fee................................................................:......... ..............I................ ......................$3,500.00 4. 50 acres or greater;.eac dditional resubmission Fee........................................:.................................. ............................... ......................$1,750.00 5. Deferral of scheduled public wring at applicant's request Fee.. ............................... . ...... ................... ................,.............. .. ........................$180.00 D, Board of Zoning Appeals: 1. Request•for a variance or sign special se permit Fee..........:............................................................... ............................... ........................$500.00 2, For other appeals to the board of zoning appeals (including appeals of zoning administrator's decision) — Fee (to be refunded if the decision of the z\fi(50): ministrator is overturned) .......$240.00 N, Required notice: 1. Preparing and mailing or delivering up to fifotices: Fee............................................................................................. ........................$200.00 plus the actual cost of first class postage 2. Preparing and mailing oz• delivering, per notithan fi (50): Fee......... ............................... .................................. ......... .........................$1.00• plus the actual cost of first class postage Published notice: Fee.......:....:...................................................................... ......... ..................Actual cost Page 3 of 6 Revised 4 -25-II eke 2012 Submittal and Review Schedule' Special Use-Permits-and Zoning Map Amendments Resubmittal ,Schedule Written Comments and Earliest Planning Commission Public Hearing* Resubmittal Dates Comments to applicant for decision -on whether to proceed to Public Hearing Legal Ad Deadline and Decision for Public Hearing ** Planning Commissipn Public Hearing. No sooner than*. Monday Wednesday Monday Tuesday Dec 19 2011 Jan 18 Feb 6 Feb 28 Tue Jan 3 Feb 1 Feb 13 Mar 6 Tue Jan 97 Feb 15 Feb 27 Mar 20 Feb 6 Mar 7 Mar 12 Apr 3 Tue Feb 29• Mar 21 Apr 2 Apr 24 Mar 5 Apr 4 Apr 16 May 8 Mar 19 Apr 18 Apr 30 May 22 Apr 2 May 2 Ma 14 Jun 5 Apr 16 ' May 16 May 28 Jun 19 May 7 Jun 6 Jun 25 Jul 17 May 21 Jun 20 Jul 9 Jul 31 Jun 4 Thu Jul 5 Jul 16 Aug 7 Jun 18 Jul 18 Jul 30 Aug 21 Jul 2 Aug 1 Aug 20 Sep 11 Jul 16 Aug 15 Tue Sep 4 Sep 25 Aug 6 Sep 5 Sep 17 - Oct 9 Aug 20 Sep 19 Oct 1 Oct 23 Tue Sep 4 Oct 3 Oct 15 Nov 6 Sep 17 Oct 17 Oct 22 Nov 13 Oct 1 Oct-31 Nov 12 Dec 4 Oct 15 Nov 14 Nov 26 Dec 18 Nov 6 Dec 5 Dec 17 Jan 8 201.3 Nov 19 Dec 19 Jan 7 2013 Jan 29 2013 Dec 3 Jan 2 2013 Jan 14 2D13 Feb 5 2013 Dec 17 Jan 16 2013 Feb 4 2013 Feb 26 2013 Dates shown in italics are changes due to a County holiday * The reviewing plann sr. will' contact applicant to discuss comments of reviewers and advise that changes that are needed are significant enough to warrant an additional submittal or advise that the the project is ready for a public hearing. If changes needed are minor, the planner will advise that . the project go to public hearing. . ** The legal ad deadline is the last date at which an applicant can decide whether to resubmit or go Iv O) 1V Iv N L IU f1'I Iv O -~'•. N. ID s •�! N Lo N IV O IV W O IV i O) IV D IV GJ1 IV 'N 1 IV O N m IV '� IV N IV Iv ` IV Iv fV tv '� .•r b �. ro to e' CD a 'M• I js p cO tD 1 CO 07 J IV �) s` cn Iv .l�• i`v W N N N =' -� :lU• _ W (O O O h, O -<I O W m IV .a W D ]' O CII O W W O '_"'•. i. i ..1. i i i ..�. i i i i i •i Iv � IV i N .\.1. IV J\. ICJ lv i N i. IV I ..1 iV i 1V i IV i 1, IU N Iv IQ IV N IV Iv Iv IV IQ i O O LO C7 m CY7 �I m O t)I = 1 \ \ tV •i �. r m -> i -A N �• •-'. i �+. IV .t. .D .s O O s D N W P1 \ D D N tO N N N N N N N N IV N N N IV IV N N IV N N N N IV N . .a m Lm ►> s i O s O -� O W N., .d W W �V N .a. s 1V D ON7 U1 fND G'I -��• '�i W G1' O W tD -�• CO .b• O O O `V J O O O N i y N N N N N N N .I J Iv N N N N N N m N N'N O N N N N IU N N D O CTI G7 .p• -li W W y IV IV N N ...� W �• IV IQ N N Iv s N N N Iv W -d• rn N CT7 -�' O N w I`V .�, IV W -_' p� Iv p) O •.I O W O O C!7 D D D N L+ J J O IU IV IU IV IQ IV IV IU N Iv IV IV 1V IV N Iv IV IU IV IV Iu IV O CD N N F�-A N ` W •�D \ \ 00 \ `��. Ot Ln \ A W 1 N \ \ N N \ \I-� Y \ N \ N N `� N O �. 111 N `Q N I- O �7 D� b. W 01 LO \ lD \ Ln \ \ \�` \ \ \W n \ \ N \ W -114 \W • \ \ -010 \J 1..p + \ \I.a � Y \ Y \ ).+ I.a + W I-' Y • I- Y F-� I.a N N N IV N N . N I-, N N N N N N N N N IN N N N N N N N N O h7 O• C LQ C) O 3 U; M 3 o w.. C Lm 3 m >y C rr S� tD S11 ' N Q c ♦D N� O 2 fD tO m m. C7 , O LO .a O 'T1 e' CD 'M• II ro i O O LO C7 m CY7 �I m O t)I = 1 \ \ tV •i �. -> i -A N �• •-'. i �+. IV .t. .D .s O O s D N W P1 \ D D N tO N N N N N N N N IV N N N IV IV N N IV N N N N IV N m Lm y O O tD W CO ~ CA '•1 \ '�1 D O CTI G7 .p• -li W W y IV IV N N ...� W �• IV IQ N N Iv s N N N Iv W -d• rn N CT7 -�' O N w I`V .�, IV W -_' p� Iv p) O •.I O W O O C!7 D D D N L+ J J O IU IV IU IV IQ IV IV IU N Iv IV IV 1V IV N Iv IV IU IV IV Iu IV CD �7 i �• i s p` i t' In I co T 1 "��• r,•I 1 1 T CT7 •ti 4 �i .la � W f •11 IV � i 1 �'� , �'� _y J B ICO t rls 1 O W IQ tJ1 J\ N W LO O W W C', U1 �1 O W \ IV \ 67 )- t W D 1 1 E ` IJ i 1V i N i N IU )J J N 1V N N 1V J,-, IV lil•I )J IJ Iv IJ IV Iv IU )J U7 O CA ID Iv T `. Y = \ tJ D� \ N \ 01 L n tT1 •� ^ \ W w N r+• Y O \ Y 1 \ I' p co )' IQ \ Ln Y \ •J O W N lr Y W. W 01 L7 Iv Y �i N I•••: N µ Y Y Y H%' Y Y Y F% N �'; Y Y Y F-' {•••� F? 1•� Y Y O h7 O• C LQ C) O 3 U; M 3 o w.. C Lm 3 m >y C rr S� tD S11 ' N Q c ♦D N� O 2 fD tO m m. C7 , O LO .a O FOR OFFICE USE ONLY SP # Fee Amount $ Date Paid By who? Receipt # Ck# By: Resubmittal of information for Special Use Permit PROJECT NUMBER THAT HAS BEEN ASSIGNED: 3 F'�Lo1 P -OOOLI Owner /Applicant Must Read and Sign I hereby certify that the information provided with this resubmittal is what has been requested from staff Signature of Owner, Contract Purchaser Date Print Name FEES that may apply: Daytime phone number of Signatory ❑ Deferral of scheduled public hearing at applicant's request $180 : . Resubmittal fees for original Special Use Permit fee of $2,000 ➢ Legal advertisement (published twice in the newspaper for each public hearing) ❑ First resubmission I I FREE ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $1,000 11, WW'�'O'rcWS311 <"','3Y..-., ,.4 1,00"r "cn .�". Resubmittal fees for original Special Use Permit fee of $1,000 First resubmission FRE ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $500 To be Daid after staff review for Dublic notice: Most applications for a Special Use Permit require at least one public hearing by. the Planning Commission and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a legal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice are required before a Special Use Permit may be heard by the Board of Supervisors. Applications reviewed by the Board of Zoning Appeals, however, only require one public hearing and therefore require just one fee for public notice. The total fee for public notice will be provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body. Staff estimates the total cost of legal advertisement and adjacent owner notification to be between $350 and $450 per hearing. This estimate reflects the average cost of public notice fees for Special Use Permit applications, but the cost of certain applications maybe higher. Preparing and mailing or delivering up to fifty (50) notices $200 + actual cost of first -class postage ➢ Preparing and mailing or delivering each notice after fifty (50) $1.00 for each additional notice + actual cost of first -class postage ➢ Legal advertisement (published twice in the newspaper for each public hearing) Actual cost (averages between $150 and $250 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 Revised 1/1/2011 Page 1 of 1