Loading...
HomeMy WebLinkAboutSDP201100082 Review Comments Miscellaneous Submittal 2012-05-24Joanne Tu Purtsezova From: Joanne Tu Purtsezova Sent: Thursday, May 24, 2012 5:58 AM To: Eugene Ryang (eryang @waterstreetstudio.net); Alan Franklin ( afranklin @waterstreetstudio.net); 'Missel, Frederick (fam5c)'; 'Schooley, Christopher (cds7c)' Cc: Philip Custer; Ana Kilmer Subject: SDP - 2011 -082 Boar's Head Sports Club - Status Hello all, Review of the revised lighting plan has concluded and SDP - 2011 -082 may be brought in for stamping and signing, assuming and contingent on the following: • Reference administrative approval date (12/29/11) for 2 waivers • Address all remaining engineering comments, previously provided, including addition of note and posting of bonds • Provide 6 total copies (2 requested by Engineering) of signature copies • Plan is submitted as approved by all reviewers, and has not been revised, except as requested I have not heard confirmation from Ana that the bonds have been posted. Ana, please confirm, so that we can wrap up this project. Please schedule a time today for stamping and signing. Bring 6 copies as requested to the agreed - upon appointment time. Please allot up to 1 hour for the appointment, as I will need to check the final version of the plan, finish the draft of the approval letter, and stamp, sign, and initial 6 copies of the amendment. Also, for the approval letter, I will need a comprehensive listing of ALL changes, small and large. This list may be e- mailed as soon as it is done. Please provide this information as soon as possible today. Otherwise, I will have to create a list myself, which may take several days. Feel free to contact me with further questions. -Joanne