Loading...
HomeMy WebLinkAboutSDP201200009 Review Comments Final Site Plan and Comps. 2012-05-16 (3)Meaan Yanialos From: DeNunzio, Joel D., P.E. (VDOT) [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Tuesday, May 08, 2012 2:21 PM To: Megan Yaniglos Subject: SDP - 2012 -00009 Old Trail Block 11 -Road Plan SDP- 2012 -00009 Old Trail Block 11 -Road Plan Megan, The subject plan with revision date of 5 -1 -2012 has been reviewed by VDOT and meets the minimum standards for proposed roads to be included in the state maintenance system. The proposed roads with this plan will be eligible for state maintenance when construction is complete and the roads meet the minimum service requirements set in the Secondary Street Acceptance Requirements contingent upon the contractor or developer meeting the following conditions: 1. Mandatory inspections at the following phases are required for roads that are proposed to be state maintained: a. Installation of any enclosed drainage system before it is covered b. Installation of any enclosed utility placements within the right -of -way before being covered c. Construction of the cuts and fills, including field density tests, before placement of roadbed base materials d. A final pavement design, based on actual soil characteristics and certified tests, shall be completed and approved before the pavement structure is placed e. Placement of base materials, including stone depths, consistent with the approved pavement design, prior to placement of the paving course or courses, followed by field density and moisture tests and the placement of a paving course as soon as possible f. Construction of pavement, including depth and density, upon completion as part of the final inspection. g. The contractor is responsible for contacting VDOT a minimum of one week prior to each of the above phases of construction to schedule an inspection. h. Failure of the contractor to schedule these inspections will require additional testing of the roads at the discretion of VDOT or may lead to the roads not being eligible for state maintenance. 2. Any revisions to this plan shall require VDOT review and approval. 3. Prior to final inspection of the proposed state maintained roads, VDOT will require as -built plans and the subdivision plat for review and approval along with other materials as described in the SSAR 24VAC30- 92 -70. If there are proposed construction entrances or road connections to existing state maintained roads, the contractor shall obtain a Land Use Permit from VDOT prior to the construction of the entrance. Joel DeNunzio, P.E. VDOT Culpeper Land Development 434 - 589 -5871 Joel .denunzioC�vdot.virginia.gov