Loading...
HomeMy WebLinkAboutSUB201200008 Review Comments Bond Estimate 2012-06-01Old Trail Village Block 11 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Summary Total Road Total Glen Valley Drive $159,770 Claremont Lane $119,390 Wheatfield Way $46,600 Wheatfield Lane $23,550 Wheatfield Place $33,200 Wheatfield Court $42,380 Grand Total $ 424,890 C:\ Users \mkoslow \Documents \Current Reviews \SUB201200008 Old Trail Village Block 11 Final 6/1/2012 Plat \E1_BE_RD_MAK_SUB - 2012 -00008 Old Trail Village Block 11.xls Page 1 of 7 [yUM1yPa Old Trail Village Block 11 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Glen Valley Drive 10 +12 to 14 +42 road length 430.0 ft 1 aggregate base 8.0 in d 430.0 ft L 32.0 ft W 339.8 cy $35.91 $12,200.53 2 asphalt base 3.0 in d 430.0 ft L 32.0 ft W 192.6 tons $73.50 $14,159.04 3 asphalt surface 2.0 in d 430.0 ft L 32.0 ft W 128.4 tons $81.90 $10,518.14 4 curb CG -6 860.0 ft $13.83 $11,892.51 5 sidewalk, concrete 5' width 860.0 ft $15.75 $13,545.00 6 ramp CG -12 4 each $315.00 $1,260.00 7 street name sign 2 each $65.00 $130.00 8 traffic control sign 4 each $49.35 $197.40 9 Street Landscape 0 Each 14 each $105.00 $1,470.00 10 manhole or drop inlet 7 each $1,365.00 $9,555.00 11 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC-1 $200 80.0 ft $23.10 $1,848.00 12 pipe, rcp (15 to 48 ") 24.0 in d 0 ES -1,2 $250 0 EC-1 $200 332.0 ft $39.90 $13,246.80 13 clear and grub (for wooded sites) 430.0 ft L 61.0 ft W 0.6 acre $10,500.00 $6,322.66 14 grading (per cy for cut or import only 0.0 cy fill 3434.0 cy cut 3434.0 cy bal $3.15 $21,634.20 15 CBR tests (1 every 0.1 mi. per road) 430.0 ft L 0.86 inc of 500' 2 each $157.50 $299.25 16 as -built drawings (1 k + price per 0.1 430.0 ft L 0.0814 mi. 1 each $1,050.00 $2,050.00 17 survey and layout (price per 0.1 mi.) 430.0 ft L 0.0814 mi. 1 Isum $525.00 $1,525.00 18 mobilization 1 Isum $525.00 $525.00 19 VDOT surety (1 lane) 430.0 ft L 0.0814 mi. 2 Lanes $2,000.00 $3,257.58 C:\ Users \mkoslow \Documents \Current Reviews \SUB201200008 Old Trail Village Block 11 Final Plat \E1_BE_RD_MAK_SUB - 2012 -00008 Old Trail Village Block 1 1.x1s Page 2 of 7 6/1/2012 Old Trail Village Block 11 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Claremont Lane 30 +12 to 33 +69 road length 357.0 ft 1 aggregate base 6.0 in d 357.0 ft L 28.0 ft W 185.1 cy $35.91 $6,647.34 2 asphalt base 3.0 in d 357.0 ft L 28.0 ft W 139.9 tons $73.50 $10,285.88 3 asphalt surface 2.0 in d 357.0 ft L 28.0 ft W 93.3 tons $81.90 $7,640.94 4 curb CG -6 714.0 ft $13.83 $9,873.55 5 sidewalk, concrete 5' width 714.0 ft $15.75 $11,245.50 6 ramp CG -12 4 each $315.00 $1,260.00 7 street name sign 1 each $65.00 $65.00 8 traffic control sign 1 each $49.35 $49.35 9 Street Landscape 0 Each 10 each $105.00 $1,050.00 10 manhole or drop inlet 6 each $1,365.00 $8,190.00 11 pipe, rcp (15 to 48 ") 15.0 in d 1 ES -1,2 $250 0 EC-1 $200 393.0 ft $23.10 $9,328.30 12 pipe, rcp (15 to 48 ") 24.0 in d 0 ES -1,2 $250 0 EC-1 $200 36.0 ft $39.90 $1,436.40 13 rip -rap, placed 12.4 ton $31.50 $392.00 14 E &S fabric,EC -2,3 16 ft L 7 ft W 12.4 sy $10.50 $130.67 15 clear and grub (for wooded sites) 357.0 ft L 53.0 ft W 0.4 acre $10,500.00 $4,560.85 16 grading (per cy for cut or import only 0.0 cy fill 2309.0 cy cut 2309.0 cy bal $3.15 $14,546.70 17 CBR tests (1 every 0.1 mi. per road) 357.0 ft L 0.714 inc of 500' 2 each $157.50 $283.50 18 as -built drawings (1k + price per 0.1 357.0 ft L 0.06761 mi. 1 each $1,050.00 $2,050.00 19 survey and layout (price per 0.1 mi.) 357.0 ft L 0.06761 mi. 1 Isum $525.00 $1,525.00 20 mobilization 1 Isum $525.00 $525.00 21 VDOT surety (1 lane) 357.0 ft L 0.06761 mi. 2 Lanes $2,000.00 $2,704.55 22 VDOT maintenance fee (1 In rd, 1 yr) 357.0 ft L 0.06761 mi. 2 Lanes $150.00 $202.84 23 VDOT admin. Cost recovery fee(1 Iai 357.0 ft L 0.06761 mi. 2 Lanes $100.00 $385.23 cost sum $94,378.59 proj mgmt $14,156.79 contingency $10,853.54 Total $119,390 C:\ Users \mkoslow \Documents \Current Reviews \SUB201200008 Old Trail Village Block 11 Final Plat \E1_BE_RD_MAK_SUB - 2012 -00008 Old Trail Village Block 1 1.x1s Page 3 of 7 6/1/2012 Old Trail Village Block 11 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Wheatfield Way 10 +12 to 12 +80 road length 268.0 ft 1 aggregate base 5.0 in d 268.0 ft L 21.0 ft W 86.9 cy $35.91 $3,118.85 2 asphalt base 3.0 in d 268.0 ft L 21.0 ft W 78.8 tons $73.50 $5,791.21 3 asphalt surface 1.5 in d 268.0 ft L 21.0 ft W 39.4 tons $81.90 $3,226.53 4 curb CG -2 536.0 ft $8.40 $4,502.40 5 sidewalk, concrete 5' width 200.0 ft $15.75 $3,150.00 6 ramp CG -12 1 each $315.00 $315.00 7 street name sign 1 each $65.00 $65.00 8 traffic control sign 4 each $49.35 $197.40 9 Street Landscape 0 Each 7 each $105.00 $735.00 10 manhole or drop inlet 4 each $1,365.00 $5,460.00 11 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 125.0 ft $23.10 $2,887.50 12 clear and grub (for wooded sites) 268.0 ft L 24.0 ft W 0.1 acre $10,500.00 $1,550.41 13 grading (per cy for cut or import only 153.0 cy fill 235.0 cy cut 235.0 cy bal $3.15 $1,480.50 14 CBR tests (1 every 0.1 mi. per road) 268.0 ft L 0.536 inc of 500' 2 each $157.50 $252.00 15 as -built drawings (1 k + price per 0.1 268.0 ft L 0.051 mi. 1 Isum $1,050.00 $2,050.00 16 survey and layout (price per 0.1 mi.) 268.0 ft L 0.051 mi. 1 Isum $525.00 $1,525.00 17 mobilization 1 Isum $525.00 $525.00 cost sum $36,831.81 proj mgmt $5,524.77 contingency $4,235.66 Total $46,600 C:\ Users \mkoslow \Documents \Current Reviews \SUB201200008 Old Trail Village Block 11 Final Plat \E1_BE_RD_MAK_SUB - 2012 -00008 Old Trail Village Block 11.xls Page 4 of 7 6/1/2012 Old Trail Village Block 11 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Wheatfield Lane 10 +12 to 11 +72 road length 160.0 ft $18,614.90 proj mgmt $2,792.23 1 aggregate base 5.0 in d 160.0 ft L 20.0 ft W 49.4 cy $35.91 $1,773.33 2 asphalt base 3.0 in d 160.0 ft L 20.0 ft W 44.8 tons $73.50 $3,292.80 3 asphalt surface 1.5 in d 160.0 ft L 20.0 ft W 22.4 tons $81.90 $1,834.56 4 curb CG -2 320.0 ft $8.40 $2,688.00 5 street name sign 2 each $65.00 $130.00 6 traffic control sign 2 each $49.35 $98.70 7 Street Landscape 0 Each 7 each $105.00 $735.00 8 manhole or drop inlet 1 each $1,365.00 $1,365.00 9 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 21.0 ft $23.10 $485.10 10 clear and grub (for wooded sites) 160.0 ft L 23.0 ft W 0.1 acre $10,500.00 $887.05 11 grading (per cy for cut or import only) 319.0 cy fill 0.0 cy cut 319.0 cy bal $3.15 $1,004.85 12 CBR tests (1 every 0.1 mi. per road) 160.0 ft L 0.32 inc of 500' 1 each $157.50 $220.50 13 as -built drawings (1 k + price per 0.1 r 160.0 ft L 0.03 mi. 1 Isum $1,050.00 $2,050.00 14 survey and layout (price per 0.1 mi.) 160.0 ft L 0.03 mi. 1 Isum $525.00 $1,525.00 15 mobilization 1 Isum $525.00 $525.00 cost sum $18,614.90 proj mgmt $2,792.23 contingency $2,140.71 Total $23,550 C:\ Users \mkoslow \Documents \Current Reviews \SUB201200008 Old Trail Village Block 11 Final Plat\E1_BE_RD_MAK_SUB-2012- 00008 Old Trail Village Block 1 1.x1s Page 5 of 7 6/1/2012 Old Trail Village Block 11 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Wheatfield Place 10 +12 to 11 +80 road length 168.0 ft 1 aggregate base 5.0 in d 168.0 ft L 20.0 ft W 51.9 cy $35.91 $1,862.00 2 asphalt base 3.0 in d 168.0 ft L 20.0 ft W 47.0 tons $73.50 $3,457.44 3 asphalt surface 1.5 in d 168.0 ft L 20.0 ft W 23.5 tons $81.90 $1,926.29 4 curb CG -2 336.0 ft $8.40 $2,822.40 5 ramp CG -12 1 each $315.00 $315.00 6 traffic control sign 2 each $49.35 $98.70 7 manhole or drop inlet 3 each $1,365.00 $4,095.00 8 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 73.0 ft $23.10 $1,686.30 9 pipe, pvc (4 to 10 ") 12.0 in d 65.0 ft $10.50 $682.50 10 clear and grub (for wooded sites) 168.0 ft L 23.0 ft W 0.1 acre $10,500.00 $931.40 11 grading (per cy for cut or import only 0.0 cy fill 642.0 cy cut 642.0 cy bal $3.15 $4,044.60 12 CBR tests (1 every 0.1 mi. per road) 168.0 ft L 0.336 inc of 500' 1 each $157.50 $220.50 13 as -built drawings (1 k + price per 0.1 168.0 ft L 0.032 mi. 1 Isum $1,050.00 $2,050.00 14 survey and layout (price per 0.1 mi.) 168.0 ft L 0.032 mi. 1 Isum $525.00 $1,525.00 15 mobilization 1 Isum $525.00 $525.00 cost sum $26,242.13 proj mgmt $3,936.32 contingency $3,017.85 Total $33,200 C:\ Users \mkoslow \Documents \Current Reviews \SUB201200008 Old Trail Village Block 11 Final Plat \E1_BE_RD_MAK_SUB - 2012 -00008 Old Trail Village Block 11.xls Page 6 of 7 6/1/2012 Old Trail Village Block 11 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Wheatfield Court 10 +00 to 12 +52 road length 252.0 ft 1 aggregate base 5.0 in d 252.0 ft L 20.0 ft W 77.8 cy $35.91 $2,793.00 2 asphalt base 3.0 in d 252.0 ft L 20.0 ft W 70.6 tons $73.50 $5,186.16 3 asphalt surface 1.5 in d 252.0 ft L 20.0 ft W 35.3 tons $81.90 $2,889.43 4 curb CG -2 504.0 ft $8.40 $4,233.60 5 street name sign 2 each $65.00 $130.00 6 Street Landscape 0 Each 25 each $105.00 $2,625.00 7 manhole or drop inlet 3 each $1,365.00 $4,095.00 8 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 203.0 ft $23.10 $4,689.30 9 clear and grub (for wooded sites) 252.0 ft L 23.0 ft W 0.1 acre $10,500.00 $1,397.11 10 grading (per cy for cut or import only 251.0 cy fill 101.0 cy cut 251.0 cy bal $3.15 $1,108.80 11 CBR tests (1 every 0.1 mi. per road) 252.0 ft L 0.504 inc of 500' 2 each $157.50 $252.00 12 as -built drawings (1k + price per 0.1 252.0 ft L 0.048 mi. 1 Isum $1,050.00 $2,050.00 13 survey and layout (price per 0.1 mi.) 252.0 ft L 0.048 mi. 1 Isum $525.00 $1,525.00 14 mobilization 1 Isum $525.00 $525.00 cost sum $33,499.40 proj mgmt $5,024.91 contingency $3,852.43 Total $42,380 C:\ Users \mkoslow \Documents \Current Reviews \SUB201200008 Old Trail Village Block 11 Final Plat \E1_BE_RD_MAK_SUB - 2012 -00008 Old Trail Village Block 1 1.x1s Page 7 of 7