Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201200013 Review Comments Bond Estimate 2012-06-01 (3)
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: Old Trail Village Block 11 W P02012 -00013 05/31/12 MAK plans submitted 5 -24 -2012 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 6.43 1500 9645 SILT FENCE LF 1163 5 5815 SAFETY FENCE LF 434 3 1302 DIVERSION DIKE LF 287 3 861 SEDIMENT BASIN 1 ACRES 6.43 1000 6430 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 24 200 4800 OUTLET PROTECTION EA 1 200 200 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal project management subtotal CONTINGENCY TOTAL BOND AMOUNT REQUIRED 31053.00 4657.95 35710.95 LS 10% 3571.10 39282.05 39300.00 last revised: 12-5-01 6/1/2012 C:\ Users \mkoslow \Documents \Current Reviews \WP0201200013 Old Trail Village Block 11 \E1_BE_ESC_MAK_WPO- 2012 -00013 Old Trail Village Block 11.xlS