Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201200013 Review Comments Bond Estimate 2012-06-01
6/1/2012 PROJECT NAME: Old Trail Village Block 11 FILE M WPO2012 -00013 DATE APPROVED: 25- May -12 Item Unit Amount Unit Cost Subtotal trees & shrubs ball /burlap planted 76 $100.00 $7,600 underdrain stone cubic yard 458 $17.00 $7,779 stone delivery load 46 $45.00 $2,059 underdrain pipe, 4" PVC linear foot 660 $1.35 $891 filter fabric square yard 347 $10.00 $3,474 sand /soil mixture cubic yard 588 $20.00 $11,767 EC -1 outlet protection each 1 $200.00 $200 class 2 rip -rap square yard 60 $110.00 $6,600 30" concrete riser structure each 1 $1,000.00 $1,000 maintenance road linear foot 708.00 $8.00 $5,664 Concrete pipe linear foot 185.00 $25.00 $4,625 gabions, class 1 rip -rap square yard 40.00 $165.00 $6,600 paved concrete ditch linear foot 300.00 $55.00 $16,500 subtotal $74,759 project management 11,214 subtotal $85,973 10% Contingency $8,597 TOTAL $94,571 ROUNDED TOTAL $94,600 min total after reduction $18,920 C:\ Users \mkoslow \Documents \Current Reviews \WPO201200013 Old Trail Village Block 11 \E1_BE_SWM_MAK_WPO- 2012 -00013 Old Trail Village Block 11.xls